PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN JALAN BATAS KOTA LAHAT- MUARA ENIM STA 181+250.00 S/D STA 190+000.00 PROVINSI SUMATERA SELATAN

NOPRIANSYAH, FANDI and KUNTARDY, - (2014) PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN JALAN BATAS KOTA LAHAT- MUARA ENIM STA 181+250.00 S/D STA 190+000.00 PROVINSI SUMATERA SELATAN. Other thesis, Politeknik Negeri Sriwijaya.

[img]
Preview
Text (Cover)
COVER.pdf

Download (333kB) | Preview
[img]
Preview
Text (BAB I PENDAHULUAN)
BAB I.pdf

Download (163kB) | Preview
[img]
Preview
Text (BAB II TIJAUAN PUSTAKA)
BAB II.pdf

Download (1MB) | Preview
[img] Text (BAB III PERHITUNGAN GEOMETRIK DAN PERKERASAN)
BAB III.pdf
Restricted to Repository staff only

Download (1MB)
[img] Text (BAB IV MANAJEMEN PROYEK)
BAB IV.pdf
Restricted to Repository staff only

Download (2MB)
[img]
Preview
Text (BAB V PENUTUP)
BAB V.pdf

Download (51kB) | Preview
[img]
Preview
Text (DAFTAR PUSTAKA)
Daftar Pustaka.pdf

Download (49kB) | Preview

Abstract

Road has a very important role in promoting economic growth both locally and nationally. In writing this final report, the authors wanted to know how good planning in planning geometric design, pavement thickness, and building appendages in Lahat Road – Muara Enim , so the path to be traversed can provide a sense of security, comfortable, and economical for road users In the geometric design of highway planning, things are a reference in planning include the calculation of horizontal alignment, vertical alignment, pavement establish what will be used, and complementary building planning. From the results of the calculations above, Lahat – Muara Enim is a road with a speed class IIA road plan 80 km / h, and in this way using 18 pieces bend. Layer of the road surface using class B Agregate CBR 60% with 32 cm thick layer, the base layer of crushed stone using a class A with a 17 cm thick layer, while a layer of gravel subbase using a class A agregate CBR 90% with a 25 cm. Then thicknes AC/Base is 19 cm. And 8 cm AC/WC thickness for Construction of roads is carried out within 252 days with a total fund of Rp 50.057.117,00,-

Item Type: Thesis (Other)
Uncontrolled Keywords: And 8 cm AC/WC thickness for Construction of roads is carried out within 252 days with a total fund of Rp 50.057.117,00,-
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Civil Engineering > Undergraduate Theses
Depositing User: Mr Bambang Anthony
Date Deposited: 03 Dec 2015 05:20
Last Modified: 03 Dec 2015 05:20
URI: http://eprints.polsri.ac.id/id/eprint/1201

Actions (login required)

View Item View Item