Yulinda, Aliska and Rachmanita, Windy and Rudiansyah, Oltra (2014) PERENCANAAN JARINGAN IRIGASI DAERAH BAKALAN GAJAH KABUPATEN MUARA ENIM. Other thesis, Politeknik Negeri Sriwijaya.
|
Text (Cover)
COVER.pdf Download (530kB) | Preview |
|
|
Text (BAB I PENDAHULUAN)
BAB I.pdf Download (143kB) | Preview |
|
|
Text (BAB II TINJAUAN PUSTAKA)
BAB II.pdf Download (1MB) | Preview |
|
![]() |
Text (BAB III PERHITUNGAN PERENCANAAN)
BAB III.pdf Restricted to Repository staff only Download (647kB) |
|
![]() |
Text (BAB IV PENGELOLAAN PROYEK)
BAB IV.pdf Restricted to Repository staff only Download (1MB) |
|
|
Text (BAB V PENUTUP)
BAB V.pdf Download (192kB) | Preview |
|
|
Text (DAFTAR PUSTAKA)
DAFTAR PUSTAKA.pdf Download (85kB) | Preview |
Abstract
final report is about the planning of irrigation network at Bakalan Gajah area Muara Enim regency. This report discusses the planning and calculation of the dimensions of the secondary line SSBGKi 1 until SSBGKa 4 with a total channel length of 5806,52 m. In addition to planning, there are 9 tertiary channels. The planning of the irrigation network is planned to meet or support the food production and food production is increasing. Planning data for the writing of this final report includes rainfall data, map, and others. The method used is the method of rata-rata Aljabar and methods Penmann and others. Based on calculations derived dimensions of each trapezoid-shaped secondary channel for SPSB 10 ( b : h = 1 : 1, v = 0,3 m/det , I = 0.00258, L = 412 m ), SPSB 9 ( b : h = 1 : 1, v = 0,3 m/det , I = 0.00116, L = 466 m ), SPSB 8 ( b : h = 1 : 2, v = 0,3 m/det , I = 0.00208, L = 430 m ), SPSB 7 ( b : h = 1 : 1.5, v = 0,3 m/det , I = 0.00159, L = 407 m ), SPSG 6 ( b : h = 1 : 1.5, v = 0,3 m/det , I = 0.00087, L = 1073 m ), SPSG 5 ( b : h = 1 : 2, v = 0,3 m/det , I = 0.00079, L = 1073 m ), SPSM 4 ( b : h = 1.5 : 2, v = 0,3 m/det , I = 0.00072, L = 883 m ), SPSM 3 ( b : h = 2 : 2, v = 0,3 m/det , I = 0.0050, L = 1602,5m ), SPSM 2 ( b : h = 2 : 2, v = 0,3 m/det , I = 0.00036, L = 1041 m ), SPSM 1 ( b : h = 1.5 : 2, v = 0,3 m/det , I = 0.00090, L = 99 m ). In implementing this project requires funding budget of Rp. Rp 12.517.651.022. Key words: Primary Channels, Irrigation, rata-rata Aljabar method.
Item Type: | Thesis (Other) |
---|---|
Uncontrolled Keywords: | Primary Channels, Irrigation, rata-rata Aljabar method. |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Civil Engineering > Undergraduate Theses |
Depositing User: | Mr Bambang Anthony |
Date Deposited: | 03 Dec 2015 05:15 |
Last Modified: | 03 Dec 2015 05:15 |
URI: | http://eprints.polsri.ac.id/id/eprint/1216 |
Actions (login required)
![]() |
View Item |