Apriana, Ayu Viska (2014) PERENCANAAN PERKUATANTEBING SUNGAI MUSI (11-14 ULU)PALEMBANG. Other thesis, Politeknik Negeri Sriwijaya.
|
Text (COVER)
COVER.pdf Download (139kB) | Preview |
|
|
Text (BAB I PENDAHULUAN)
BAB I.pdf Download (18kB) | Preview |
|
|
Text (BAB II TINJAUAN PUSTAKA)
BAB II.pdf Download (1MB) | Preview |
|
![]() |
Text (BAB III PERHITUNGAN KONTRUKSI)
BAB III.pdf Restricted to Repository staff only Download (557kB) |
|
![]() |
Text (BAB IV MANAJEMEN PROYEK)
BAB IV.pdf Restricted to Repository staff only Download (720kB) |
|
|
Text (BAB V PENUTUP)
BAB V.pdf Download (41kB) | Preview |
|
|
Text (DAFTAR PUSTAKA)
DAFTAR PUSTAKA.pdf Download (8kB) | Preview |
Abstract
Sheet Pile used as a retaining wall construction. Construction is later expected to prevent scour the land and prevent land sliding and can make the area surrounding the banks of the River Musi to cleanly and beautifully. Sheet Pile on the project is planned to make the area as a place Ulu 11-14 people daily activities. Planning of the concrete sheet pileusing the method calculation of budget plan (RAB), Description Unit Price Analysis and Compensation Network Planning (NWP) to determine the time and squence of work to do and to control the financial progress of the work and to use the curve S. Based on the calculation, it can be concluded concrete sheet pile serving vessel up to 5,154 ton.m weights. With a 20 cm thick plate, beam size 40 x 70 cm, the size of the pile cap 80 x 100 cm, the size 50 and 60 cm pile, and to carry out this project requires funding budget of Rp. 6.128.892.000
Item Type: | Thesis (Other) |
---|---|
Uncontrolled Keywords: | Based on the calculation, it can be concluded concrete sheet pile serving vessel up to 5,154 ton.m weights. With a 20 cm thick plate, beam size 40 x 70 cm, the size of the pile cap 80 x 100 cm, the size 50 and 60 cm pile, and to carry out this project requires funding budget of Rp. 6.128.892.000 |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Civil Engineering > Undergraduate Theses |
Depositing User: | Mrs Trisni Handayani |
Date Deposited: | 02 Oct 2015 03:27 |
Last Modified: | 02 Oct 2015 03:27 |
URI: | http://eprints.polsri.ac.id/id/eprint/1227 |
Actions (login required)
![]() |
View Item |