PERENCANAAN JEMBATAN BETON PRATEGANG SUNGAI KUNGKU KABUPATEN MUSI RAWAS PROVINSI SUMATRA SELATAN

Putra, Ari Okta and Fadholy, Jodi Yusuf (2014) PERENCANAAN JEMBATAN BETON PRATEGANG SUNGAI KUNGKU KABUPATEN MUSI RAWAS PROVINSI SUMATRA SELATAN. Other thesis, Politeknik Negeri Sriwijaya.

[img]
Preview
Text (COVER)
Cover.pdf

Download (313kB) | Preview
[img]
Preview
Text (BAB I PENDAHULUAN)
BAB I.pdf

Download (152kB) | Preview
[img]
Preview
Text (BAB II TINJAUAN PUSTAKA)
BAB II.pdf

Download (1MB) | Preview
[img] Text (BAB III PERHITUNGAN KONSTRUKSI)
BAB III.pdf
Restricted to Repository staff only

Download (2MB)
[img] Text (BAB IV MANAJEMEN PROYEK)
BAB IV.pdf
Restricted to Repository staff only

Download (1MB)
[img]
Preview
Text (BAB V PENUTUP)
BAB V.pdf

Download (85kB) | Preview
[img]
Preview
Text (DAFTAR PUSTAKA)
Daftar pustaka.pdf

Download (85kB) | Preview

Abstract

THE PLAN OF PRESTRESSED CONCRETE BRIDGE SUNGAI KUNGKU MUSI RAWAS REGION SOUTH SUMATERA PROVINCE The bridge is located in South Sumatera Musi Rawas at Sungai Kungku in plantation area, it is a bridge that functioned for increase transportation services and also economic welfare righteous of people that exist in amoung the bridge. The bridge has span along 35 meters and wide 9,90 meters and supported by 2 bridge head. it has 5 longitudinal girder with spacing between girder to girder 1,85 meters. The main structure of bridge is a Prestress Concrete I Girder (PCI), with postension method and quality of concrete K-500. Because of the plate of floor used reinforced concrete construction insitu method, so it will be composite action between the precast beam and slab cast in place. As for the construction of abutments are also planned using reinforced concrete insitu method. Based on the test results sondir, the competent soil layer found in depth of 10,40 meters and 10,80 meters. The location of competent soil layer is relative deep, so that pile foundation is used to exploit the carrying capacity of the soil friction and shear stress beneath a blanket around the pile foundation. The Analysis within this construction calculation uses RSNI T-02-2005 (Standard Loading For The Bridge) and RSNI T-12-2004 (Standard Concrete For The Bridge Plans). Besides planning the bridge, the analysis of bridge also uses some literature as a source for referency. Based on calculation results, this project will cost Rp. 5,475,525,000.00 to end within 145 work days. Key words: Transportation and economy, Bridge, Prestress

Item Type: Thesis (Other)
Uncontrolled Keywords: Transportation and economy, Bridge, Prestress
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Civil Engineering > Undergraduate Theses
Depositing User: Mrs Trisni Handayani
Date Deposited: 03 Dec 2015 05:08
Last Modified: 03 Dec 2015 05:08
URI: http://eprints.polsri.ac.id/id/eprint/1254

Actions (login required)

View Item View Item