FIRDAUS, - and JEFRIANSYAH, - (2014) PERENCANAAN PEMBANGUNAN DUPLIKASI JEMBATAN BETON BERTULANG LIAM BESAR KEC. MANDIANGIN KAB. SAROLANGUN PROVINSI JAMBI. Other thesis, Politeknik Negeri Sriwijaya.
|
Text (COVER)
cover.pdf Download (94kB) | Preview |
|
|
Text (BAB I PENDAHULUAN)
BAB I.pdf Download (24kB) | Preview |
|
|
Text (BAB II LANDASAN TEORI)
BAB II.pdf Download (1MB) | Preview |
|
![]() |
Text (BAB III PERHITUNGAN DAN PERENCANAAN)
BAB III.pdf Restricted to Repository staff only Download (3MB) |
|
![]() |
Text (BAB IV MANAJEMEN PROYEK)
BAB IV.pdf Restricted to Repository staff only Download (350kB) |
|
|
Text (BAB V PENUTUP)
BAB V.pdf Download (17kB) | Preview |
|
|
Text (DAFTAR PUSTAKA)
DAFTAR PUSTAKA.pdf Download (2kB) | Preview |
Abstract
DUPLICATE DESIGN A CONCRETE LIAM BESAR BRIDGE IN MANDIANGIN VILLAGE SAROLANGUN DISTRICT JAMBI PROVINCE Duplicate design a concrete Liam Besar bridge in Mandiangin village is because the old bridge is not save to be a transportation. Building of the bridge are to make the transportation expedite and improve economic side in Mandiangin village and surrounding. The reason why writer take this design are because its take many knowledge discipline such as Engineering Mechanics, Soil Engineering, Concrete, Foundation and Project Management. The landscape of bridge is planed 20 meters and the width 7 meters with the upper building and the bottom building is from concrete, with the foundation is pile. The construction count from bridge is seeing RSNI T – 02 – 2005 (Loading Standard for Brige), RSNI T – 12 – 2004 (Concrete Standard Design for Bridge). Base on planning, this bridge is spend Rp. 3.371.667.957,00 and take 171 work days.
Item Type: | Thesis (Other) |
---|---|
Uncontrolled Keywords: | The reason why writer take this design are because its take many knowledge discipline such as Engineering Mechanics, Soil Engineering, Concrete, Foundation and Project Management. The landscape of bridge is planed 20 meters and the width 7 meters with the upper building and the bottom building is from concrete, with the foundation is pile |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Civil Engineering > Undergraduate Theses |
Depositing User: | Mrs Trisni Handayani |
Date Deposited: | 01 Dec 2015 01:41 |
Last Modified: | 01 Dec 2015 01:41 |
URI: | http://eprints.polsri.ac.id/id/eprint/1350 |
Actions (login required)
![]() |
View Item |