PERENCANAAN SISTEM JARINGAN PIPA DISTRIBUSI AIR BERSIH DI KELURAHAN LEBUNG GAJAH KECAMATAN SEMATANG BORANG KOTA PALEMBANG

Nitya, Rida and Fitri Yanti, Indah (2014) PERENCANAAN SISTEM JARINGAN PIPA DISTRIBUSI AIR BERSIH DI KELURAHAN LEBUNG GAJAH KECAMATAN SEMATANG BORANG KOTA PALEMBANG. Other thesis, Politeknik Negeri Sriwijaya.

[img] Text (Cover)
Cover.pdf

Download (171kB) | Preview
[img]
Preview
Text (BAB I PENDAHULUAN)
BAB I.pdf

Download (9kB) | Preview
[img]
Preview
Text (BAB II TINJAUAN PUSTAKA)
BAB II.pdf

Download (349kB) | Preview
[img] Text (BAB III PERHITUNGAN)
Bab III.pdf
Restricted to Repository staff only

Download (2MB)
[img] Text (BAB IV RENCANA KERJA DAN SYARAT-SYARAT)
BAB IV.pdf
Restricted to Repository staff only

Download (385kB)
[img]
Preview
Text (BAB V PENUTUP)
BAB V.pdf

Download (5kB) | Preview
[img]
Preview
Text (DAFTAR PUSTAKA)
DAFTAR PUSTAKA.pdf

Download (5kB) | Preview

Abstract

Kelurahan Lebung Gajah is a residential area and trade which envolve every year. Because the increase is frequent happened by obstacle to all customer that where clean water supply existing less served favorably. The purpose from author is to know how much amount of debits that should be fluidized in that region. Methodology used namely collect secondary data. Population data used to calculate population projection for 20 years onward. And finally calculation about to calculate water need number that next will be are used to analyze pipe network with Hardy Cross's method. From analysis result acquired namely the calculation of population projection use Requesi Eksponensial Metode with Q the plan age total namely 79,639 liters/second to 2014-2033. In this clean water distribution network planning pipe type planned namely pipe type with diameter of 110 mm, 125 mm, 140 mm, 160 mm, 180 mm, 200 mm, 225 mm, 250 mm, 280 mm. Moreover, to get that water distribution fulfilled to entire plan local required reservoir volume by about 17.201,98 m³ with budget-estimate plan as big as Rp. 4.771.981.200,00 with 174 day work time. Keywords : Clean water, Water Debits, Hardy Cross, Requesi Eksponensial

Item Type: Thesis (Other)
Uncontrolled Keywords: Clean water, Water Debits, Hardy Cross, Requesi Eksponensial
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Civil Engineering > Undergraduate Theses
Depositing User: Mr Bambang Anthony
Date Deposited: 30 Nov 2015 01:42
Last Modified: 30 Nov 2015 01:42
URI: http://eprints.polsri.ac.id/id/eprint/1375

Actions (login required)

View Item View Item