PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN JALAN MAYJEN SATIBI DARWIS – TRANSMIGRASI RAMBUTAN STA 10 + 000 s/d STA 15 + 000 PROVINSI SUMATERA SELATAN

Ridho, Muhammad and Rahmawati, Nurul (2014) PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN JALAN MAYJEN SATIBI DARWIS – TRANSMIGRASI RAMBUTAN STA 10 + 000 s/d STA 15 + 000 PROVINSI SUMATERA SELATAN. Other thesis, Politeknik Negeri Sriwijaya.

[img]
Preview
Text (COVER)
Cover, Kata Pengantar, Abstrak, Dftr Isi.pdf

Download (405kB) | Preview
[img]
Preview
Text (BAB I PENDAHULUAN)
BAB I.pdf

Download (71kB) | Preview
[img]
Preview
Text (BAB II DASAR TEORI)
BAB II.pdf

Download (1MB) | Preview
[img] Text (BAB III PERHITUNGAN GEOMETRIK DAN TEBAL PERKERASAN)
BAB III.pdf
Restricted to Repository staff only

Download (809kB)
[img] Text (BAB IV MANAJEMEN PROYEK)
BAB IV.pdf
Restricted to Repository staff only

Download (1MB)
[img]
Preview
Text (BAB V PENUTUP)
BAB V.pdf

Download (50kB) | Preview
[img]
Preview
Text (DAFTAR PUSTAKA.)
Daftar Pustaka.pdf

Download (48kB) | Preview

Abstract

This final report is about geometric design and solid thickness at mayjen satibi darwis avenue – rambutan transmigration STA 10 + 000 s / d STA 15 + 000 south sumatra province. The writer design the planning based on the level of avenue, classification level of area and traffic load. Satitistic result from LHR is 17646,89 smp, this avenue categorized in class III C (local avenue) based on RSNI Geometric avenue in 2004, which have 4 bends consists of Full Circle, Spiral Circle Spiral, and Spiral Spiral. Based on total number of vehicles which through the road, thickness planned for this avenue consists of its cover AC W is 4 cm, AC BC 8 cm, AC Base 12 cm, upper foundation (CBR 90%) 15 cm, while bottom foundation using Sirtu class B (CBR 60%) 18 cm. In the upper of AC WC, AC BC and AC Base using hard and soft aggregates, Asphalt and Filler either for upper and bottom foundation. Based on the calculation data, the cost for mayjen satibi darwis avenue project – rambutan transmigration spent , Rp. 47.824.544.000,00 (forty-seven billion, eight hundred and twenty four million five hundred and forty-four thousand rupiah) Keywords: Geometric, LHR, Bend, Thickness, RAB

Item Type: Thesis (Other)
Uncontrolled Keywords: Geometric, LHR, Bend, Thickness, RAB
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Civil Engineering > Undergraduate Theses
Depositing User: Mrs Trisni Handayani
Date Deposited: 18 Nov 2015 08:54
Last Modified: 18 Nov 2015 08:54
URI: http://eprints.polsri.ac.id/id/eprint/1381

Actions (login required)

View Item View Item