PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN RUAS JALAN SP. RAMBUTAN – TULUNG SELAPAN KABUPATEN OGAN KOMERING ILIR STA 31+852 – STA 37+100 PROVINSI SUMATERA SELATAN

Falaah, Hidayatul and Agustini, Welli (2015) PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN RUAS JALAN SP. RAMBUTAN – TULUNG SELAPAN KABUPATEN OGAN KOMERING ILIR STA 31+852 – STA 37+100 PROVINSI SUMATERA SELATAN. Other thesis, Politeknik Negeri Sriwijaya.

[img]
Preview
Text (COVER)
COVER.pdf

Download (212kB) | Preview
[img]
Preview
Text (BAB I PENDAHULUAN)
BAB I.pdf

Download (104kB) | Preview
[img]
Preview
Text (BAB II TINJAUAN PUSTAKA)
BAB II.pdf

Download (659kB) | Preview
[img] Text (BAB III PEMBAHASAN)
BAB III PEMBAHASAN.pdf
Restricted to Repository staff only

Download (91MB)
[img] Text (BAB IV PENUTUP)
BAB IV KESIMPULAN DAN SARAN.pdf
Restricted to Repository staff only

Download (83kB)
[img]
Preview
Text (DAFTAR PUSTAKA)
DAFTAR PUSTAKA.pdf

Download (60kB) | Preview

Abstract

Jalan Sp.Rambutan – Tulung Selapan is a road that connects subdistrict Sp.Rambutan and Tulung Selapan. This street have the important things to improve the grew of economy in around of the village, also to increase people life in all of the parts. In the final report, the writer do the re-planning. How the best way in the planning geometric design, the harden flexible construction, the classify of street, and the calculation of cost in Sp.Rambutan – Tulung Selapan untill the street can bring the peaceful, comfortable and reachable for the customer. In the planning of geometric design street, the guidance there are the calculation alinyemen horizontal, alinyemen vertical, classify of street, and what the harden was used. Based on the calculation above, found that Desa Sp.Rambutan – Tulung Selapan was in the classify II A with the planning speed 60 km/jam, there are 2 band 2 coloumn where the width of street 2x3,5 m and the width of street shoulder. In this street was use 5 curve with thick harden, covering layer of the street was use Laston where width 10 cm, the over covering layer the street was use the fration stone classify A with thick 15 cm, mean while the under covering layer of the street was use Sirtu classify B with the thick 20 cm. Developing this street was done in 162 days with the total cost Rp. 33.600.000.000,00 (Thirty Billion Six Hundred Million Rupiah).

Item Type: Thesis (Other)
Uncontrolled Keywords: In the planning of geometric design street, the guidance there are the calculation alinyemen horizontal, alinyemen vertical, classify of street, and what the harden was used
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Civil Engineering > Undergraduate Theses
Depositing User: Mrs Trisni Handayani
Date Deposited: 26 Nov 2015 01:54
Last Modified: 26 Nov 2015 01:54
URI: http://eprints.polsri.ac.id/id/eprint/1525

Actions (login required)

View Item View Item