PERENCANAAN JARINGAN PIPA DISTRIBUSI AIR BERSIH KELURAHAN PIPA REJA KECAMATAN KEMUNING PALEMBANG

Fauziah, - and Hericah, Yolanda (2015) PERENCANAAN JARINGAN PIPA DISTRIBUSI AIR BERSIH KELURAHAN PIPA REJA KECAMATAN KEMUNING PALEMBANG. Other thesis, Politeknik Negeri Sriwijaya.

Full text not available from this repository.

Abstract

The village is a residential area Parings Pipe and the trade area from year to year continues to increase. Due to the increase in the common obstacles for those customers that clean water supply where there are less well served. The purpose of the writer wanted to know how large the debit must be irrigated in the region. The methodology used, namely collecting data secondary. Population data used to calculate the population projections for the next 20 years. From the results of the calculations related to calculate the amount of water that would be used to analyze the pipeline with the Hardy Cross method. The analysis of the results obtained, namely population projection calculations using the method of Exponential with Requesi Q total age i.e. plan amounted to 83,92 litres/second to 2016 – 2035. In planning the network pipe this type of clean water distribution pipeline planned i.e. the type of HDPE pipes with a diameter of 90 mm, 160 mm, dan 200 mm. With budget estimate plan as big as Rp. 2.874.000.000,00 with 85 day work time. Keywords : Clean water, Water debits, Arithmetic, Hardy Cross

Item Type: Thesis (Other)
Uncontrolled Keywords: Clean water, Water debits, Arithmetic, Hardy Cross
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Civil Engineering > Undergraduate Theses
Depositing User: Mrs Trisni Handayani
Date Deposited: 26 Nov 2015 01:52
Last Modified: 26 Nov 2015 01:52
URI: http://eprints.polsri.ac.id/id/eprint/1530

Actions (login required)

View Item View Item