GEGANA, DF ADITYA and ANGGRAINI, FITRIA (2015) Peningkatan Ruas Jalan Trans B2 STA 23+000- STA 32+000 KM 11 Kecamatan Plakat Tinggi Kabupaten Musi Banyuasin. Other thesis, Politeknik Negeri Sriwijaya.
|
Text (COVER)
COVER, DAFTAR ISI , DAFTAR GAMBAR, DAFTAR TABEL.pdf Download (375kB) | Preview |
|
|
Text (BAB I PENDAHULUAN)
BAB 1.pdf Download (166kB) | Preview |
|
|
Text (BAB II TINJAUAN PUSTAKA)
BAB 2.pdf Download (1MB) | Preview |
|
![]() |
Text (BAB III PERHITUNGAN GEOMETRIK DAN PERKERASAN)
BAB 3.pdf Restricted to Repository staff only Download (2MB) |
|
![]() |
Text (BAB IV MANAJEMEN PROYEK)
BAB 4.pdf Restricted to Repository staff only Download (1MB) |
|
|
Text (BAB V PENUTUP)
BAB 5.pdf Download (81kB) | Preview |
|
|
Text (DAFTAR PUSTAKA)
DAFTAR PUSTAKA.pdf Download (6kB) | Preview |
Abstract
Planning an increase in road Trans B2 STA 23+000- STA 32+000 KM 11 Kecamatan Plakat Tinggi Kabupaten Musi Banyuasin. The final task is basically to discuss the process of implementation of the work path from initial planning to get the best result among the subjects fulfill its strength and stability of the overall structure elements, structural feasibility, suitability, ease of construction, economic and easthetic pleasing form. Utilities of bridge transportation as one of product of the construction service activity so the process of transportation utilities building must be on valid law. The aim of the composition of the final task is to apply the that writer sciences has got at the lecture, so the writer is hoped sciencies to : a. To design the ways of construction. b. To implement the roles which is out by the government in ways design. c. To make tenders document from the ways building design. According to the process of estimating analysis which is design with long in 9 km and wide in 7 m. From the analysis above can be conclused that every ways design must be designed according to the standard of valid ways design.
Item Type: | Thesis (Other) |
---|---|
Uncontrolled Keywords: | Utilities of bridge transportation as one of product of the construction service activity so the process of transportation utilities building must be on valid law. The aim of the composition of the final task is to apply the that writer sciences has got at the lecture, so the writer is hoped sciencies to : a. To design the ways of construction. b. To implement the roles which is out by the government in ways design. c. To make tenders document from the ways building design. According to the process of estimating analysis which is design with long in 9 km and wide in 7 m. From the analysis above can be conclused that every ways design must be designed according to the standard of valid ways design. |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Civil Engineering > Undergraduate Theses |
Depositing User: | Mrs Trisni Handayani |
Date Deposited: | 25 Nov 2015 01:29 |
Last Modified: | 25 Nov 2015 01:29 |
URI: | http://eprints.polsri.ac.id/id/eprint/1562 |
Actions (login required)
![]() |
View Item |