EVALUASI KEBUTUHAN DAYA LISTRIK PADA GEDUNG DERMAGA POINT (AMPERA CONVENTION CENTRE) PALEMBANG

BAROKAH, FITRA (2015) EVALUASI KEBUTUHAN DAYA LISTRIK PADA GEDUNG DERMAGA POINT (AMPERA CONVENTION CENTRE) PALEMBANG. Other thesis, Politeknik Negeri Sriwijaya.

Full text not available from this repository.

Abstract

Dermaga Point Building as public places for cafe, restaurant, seminar events, concert events and office building employees. At this building has an installed power of 282.434 Watt. To know the power usage at the Dermaga Point Building then installed load calculation and measurement of unused load in order to get the results of the evaluation of the unused load for one week of 7.816.611 Watt. For peak load occurs on Sunday, May 31, 2015 at 24.00 am of 109.278 Watt. Avarage daily load of 65.457 Watt, whereas low load occurs on Tuesday, May 26, 2015 at 14.00 pm with the amount of power 50.600 Watt. Key words : Dermaga Point Building , Evaluation Power Requirement.

Item Type: Thesis (Other)
Uncontrolled Keywords: Dermaga Point Building , Evaluation Power Requirement.
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering
Divisions: Electrical Engineering > Undergraduate Theses
Depositing User: Mrs Trisni Handayani
Date Deposited: 18 Nov 2015 08:18
Last Modified: 18 Nov 2015 08:18
URI: http://eprints.polsri.ac.id/id/eprint/1683

Actions (login required)

View Item View Item