EFISIENSI GENERATOR 11 KV/ 65 MW (PLTU) UNIT 4 PT. PLN (PERSERO) PEMBANGKITAN SUMBAGSEL SEKTOR PEMBANGKITAN BUKIT ASAM

Saputra, Rizki Ananda (2015) EFISIENSI GENERATOR 11 KV/ 65 MW (PLTU) UNIT 4 PT. PLN (PERSERO) PEMBANGKITAN SUMBAGSEL SEKTOR PEMBANGKITAN BUKIT ASAM. Other thesis, Politeknik Negeri Sriwijaya.

[img]
Preview
Text (COVER)
Cover.pdf

Download (474kB) | Preview
[img]
Preview
Text (BAB I PENDAHULUAN)
BAB I.pdf

Download (156kB) | Preview
[img]
Preview
Text (BAB II TINJAUAN PUSTAKA)
BAB II.pdf

Download (812kB) | Preview
[img] Text (BAB III KEADAAN UMUM)
BAB III.pdf
Restricted to Repository staff only

Download (1MB)
[img] Text (BAB IV PEMBAHASAN)
BAB IV.pdf
Restricted to Repository staff only

Download (692kB)
[img]
Preview
Text (BAB V KESIMPULAN DAN SARAN)
BAB V.pdf

Download (231kB) | Preview
[img]
Preview
Text (DAFTAR PUSTAKA)
Daftar Pustaka.pdf

Download (120kB) | Preview

Abstract

Generator efficiency is the ratio between the output power (Pout) and input power (Pin). Efficiency is affected by the load current, if the current is greater then the power lossis also getting bigger, it causes the efficiency to be small, on the contrary if the load current is small, the power loss will also be small so that efficiency becomes greater. Writer wanted to know how much the efficiency of the PLTU generators in Bukit Asam, efficiencies gained from the results of calculations by comparing the output power to input power ranging from24 to 26 April 2015 shows that the average efficiency of the generator ranges between 99.80%. Keywords: Lossestotal, Efficiency, Generator

Item Type: Thesis (Other)
Uncontrolled Keywords: Lossestotal, Efficiency, Generator
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering
Divisions: Electrical Engineering > Undergraduate Theses
Depositing User: Mrs Trisni Handayani
Date Deposited: 18 Nov 2015 08:07
Last Modified: 18 Nov 2015 08:07
URI: http://eprints.polsri.ac.id/id/eprint/1708

Actions (login required)

View Item View Item