ANALISA PERBAIKAN SUSUT TEGANGAN DENGAN CARA PEMECAHAN BEBAN DI PT. PLN (PERSERO) RAYON SEKAYU PENYULANG BURGO GI BETUNG BERBASIS ETAP

RINELDY, REDHO AKBAR (2015) ANALISA PERBAIKAN SUSUT TEGANGAN DENGAN CARA PEMECAHAN BEBAN DI PT. PLN (PERSERO) RAYON SEKAYU PENYULANG BURGO GI BETUNG BERBASIS ETAP. Other thesis, Politeknik Negeri Sriwijaya.

Full text not available from this repository.

Abstract

The problem faced by the PT. PLN (Persero) as the only one sole provider of electric energy is how to provide quality electricity services, reliable, continuous, and has high efficiency. To meet those parameters, will be solving the burden on Burgo Fedeer. In addition to reducing the voltage losses in the network and to improve system reliability at the network, bypass load carried on the burgo fedeer. This is done bypass load put on the pure SUTM from outgoing burgo to incoming GH Babat as far as 33 km using 150 mm2 conductor A3CS. By using ETAP Sotware 12.6, simulating the bypass load is done by drawing a single line diagram burgo feeder and integrate field data into ETAP software. Burgo feeder network analysis results before bypass loads using ETAP software acquired 12.6 voltage at the Air Balui load value of 5,833 kV. Meanwhile, after bypass load increases the voltage values obtained on Air Balui load of 7,541 kV. Based on these results, it can be seen that the bypass load on the burgo feeder potentially reducing the voltage losses in the network.

Item Type: Thesis (Other)
Uncontrolled Keywords: This is done bypass load put on the pure SUTM from outgoing burgo to incoming GH Babat as far as 33 km using 150 mm2 conductor A3CS. By using ETAP Sotware 12.6, simulating the bypass load is done by drawing a single line diagram burgo feeder and integrate field data into ETAP software. Burgo feeder network analysis results before bypass loads using ETAP software acquired 12.6 voltage at the Air Balui load value of 5,833 kV. Meanwhile, after bypass load increases the voltage values obtained on Air Balui load of 7,541 kV. Based on these results, it can be seen that the bypass load on the burgo feeder potentially reducing the voltage losses in the network.
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering
Divisions: Electronic Engineering > Undergraduate Theses
Depositing User: Mrs Trisni Handayani
Date Deposited: 18 Nov 2015 08:07
Last Modified: 18 Nov 2015 08:07
URI: http://eprints.polsri.ac.id/id/eprint/1709

Actions (login required)

View Item View Item