PERHITUNGAN JATUH TEGANGAN PADA PENYULANG BELIMBING YANG DISUPLAI DARI GARDU INDUK BOOM BARU DENGAN BANTUAN SOFTWARE ETAP

DHARMAWAN, MUHAMMAD RANDHIKA (2015) PERHITUNGAN JATUH TEGANGAN PADA PENYULANG BELIMBING YANG DISUPLAI DARI GARDU INDUK BOOM BARU DENGAN BANTUAN SOFTWARE ETAP. Other thesis, Politeknik Negeri Sriwijaya.

[img]
Preview
Text (COVER)
Cover.pdf

Download (110kB) | Preview
[img]
Preview
Text (BAB I PENDAHULUAN)
BAB I.pdf

Download (42kB) | Preview
[img]
Preview
Text (BAB II TINJAUAN PUSTAKA)
BAB II.pdf

Download (1MB) | Preview
[img] Text (BAB III METODOLOGI PENELITIAN)
BAB III.pdf
Restricted to Repository staff only

Download (41kB)
[img] Text (BAB IV HASIL DAN PEMBAHASAN)
BAB IV.pdf
Restricted to Repository staff only

Download (807kB)
[img]
Preview
Text (BAB V KESIMPULAN DAN SARAN)
Bab V.pdf

Download (27kB) | Preview
[img]
Preview
Text (DAFTAR PUSTAKA)
DAFTAR PUSTAKA.pdf

Download (11kB) | Preview

Abstract

In electric power distribution always occur drop voltage and losses of electrical power, it is caused by several factors such as, line resistance, line current, power factor (Cos φ), and the central load location which is far from the substation. Thus, in the distribution of electricity through distribution line will having a drop voltage along the line which reduces the supply of electrical energy distributed to the central load location and make the electrical energy distributed to the consumers reduced or in other word the electrical energy distributed to the consumers is different from the energy that has been sent. Drop voltage in distribution network can not be eliminated completely, because of the equipments which is used in distribution system may not have an efficiency 100 % but one thing that we should keep in mind is whether the drop voltage is still in the tolerance limit or not. This final report discusses the drop voltage calculations in the feeder by using ETAP software. This final report was being done through a case study at Boom Baru Substation especially in Belimbing Feeder. The results of calculation and simulation that had been done by ETAP 12.6 shows that the drop voltage which occurs is 0,84 on day peak burden and 0,63 on night peak burden. The drop voltage that occured in Belimbing Feeder is still in the limit allowed by PLN on SPLN 72:1987, amounting to 5 %. Keywords : Drop voltage, distribution, ETAP

Item Type: Thesis (Other)
Uncontrolled Keywords: Drop voltage, distribution, ETAP
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering
Divisions: Electrical Engineering > Undergraduate Theses
Depositing User: Mrs Trisni Handayani
Date Deposited: 18 Nov 2015 08:45
Last Modified: 18 Nov 2015 08:45
URI: http://eprints.polsri.ac.id/id/eprint/1719

Actions (login required)

View Item View Item