Alfurqan, Bintar (2014) PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN JALAN PADA JALAN TANGERANG - CIPONDOH KOTA TANGERANG PROVINSI BANTEN STA 0+000 − STA 5+170. Other thesis, Politeknik Negeri Sriwijaya.
|
Text (COVER)
Cover.pdf Download (85kB) | Preview |
|
|
Text (BAB I PENDAHULUAN)
BAB 1.pdf Download (36kB) | Preview |
|
|
Text (BAB II TINJAUAN PUSTAKA)
BAB II.pdf Download (402kB) | Preview |
|
![]() |
Text (BAB III PERHITUNGAN)
BAB III.pdf Restricted to Repository staff only Download (2MB) |
|
![]() |
Text (BAB IV PENGELOLAAN PROYEK)
bab IV v2.pdf Restricted to Repository staff only Download (1MB) |
|
|
Text (BAB V PENUTUP)
BAB V (PASTI).pdf Download (8kB) | Preview |
|
|
Text (DAFTAR PUSTAKA)
Daftar Pustaka.pdf Download (95kB) | Preview |
Abstract
Tangerang – Cinpondoh street is a road that connects Tangerang to Cipondoh area, this road has a very important role in economic growth both local and national. Wrote this final report the author would like to know how to plan and design of geometric and hard compact on Tangerang – Cipondoh street, so the road will be able to give a sense of secure, convenient, and economical way for the user. In the planning design of geometric road, there are some references in planning include calculation of the horizontal alignment , vertical alignment, hard compact and define what that will be used. As the results of calculations, Tangerang – Cipondoh street is classificate to class II A road with planning speed 70 km/hour, and this road used 8 curves. For surface area, hard compact thickness is 7.5 cm used asphalt concrete, sub base is 20 cm used split class A and base is 20 cm used sirtu class A. This road building was carried out within 113 days with a total fund Rp 34,542,339,400.00
Item Type: | Thesis (Other) |
---|---|
Uncontrolled Keywords: | In the planning design of geometric road, there are some references in planning include calculation of the horizontal alignment , vertical alignment, hard compact and define what that will be used. As the results of calculations, Tangerang – Cipondoh street is classificate to class II A road with planning speed 70 km/hour, and this road used 8 curves. For surface area, hard compact thickness is 7.5 cm used asphalt concrete, sub base is 20 cm used split class A and base is 20 cm used sirtu class A. This road building was carried out within 113 days with a total fund Rp 34,542,339,400.00 |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) T Technology > TK Electrical engineering. Electronics Nuclear engineering |
Divisions: | Civil Engineering > Undergraduate Theses |
Depositing User: | Mrs Trisni Handayani |
Date Deposited: | 18 Nov 2015 08:45 |
Last Modified: | 18 Nov 2015 08:45 |
URI: | http://eprints.polsri.ac.id/id/eprint/1720 |
Actions (login required)
![]() |
View Item |