PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN JALAN PADA JALAN TANGERANG - CIPONDOH KOTA TANGERANG PROVINSI BANTEN STA 0+000 − STA 5+170

Alfurqan, Bintar (2014) PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN JALAN PADA JALAN TANGERANG - CIPONDOH KOTA TANGERANG PROVINSI BANTEN STA 0+000 − STA 5+170. Other thesis, Politeknik Negeri Sriwijaya.

[img]
Preview
Text (COVER)
Cover.pdf

Download (85kB) | Preview
[img]
Preview
Text (BAB I PENDAHULUAN)
BAB 1.pdf

Download (36kB) | Preview
[img]
Preview
Text (BAB II TINJAUAN PUSTAKA)
BAB II.pdf

Download (402kB) | Preview
[img] Text (BAB III PERHITUNGAN)
BAB III.pdf
Restricted to Repository staff only

Download (2MB)
[img] Text (BAB IV PENGELOLAAN PROYEK)
bab IV v2.pdf
Restricted to Repository staff only

Download (1MB)
[img]
Preview
Text (BAB V PENUTUP)
BAB V (PASTI).pdf

Download (8kB) | Preview
[img]
Preview
Text (DAFTAR PUSTAKA)
Daftar Pustaka.pdf

Download (95kB) | Preview

Abstract

Tangerang – Cinpondoh street is a road that connects Tangerang to Cipondoh area, this road has a very important role in economic growth both local and national. Wrote this final report the author would like to know how to plan and design of geometric and hard compact on Tangerang – Cipondoh street, so the road will be able to give a sense of secure, convenient, and economical way for the user. In the planning design of geometric road, there are some references in planning include calculation of the horizontal alignment , vertical alignment, hard compact and define what that will be used. As the results of calculations, Tangerang – Cipondoh street is classificate to class II A road with planning speed 70 km/hour, and this road used 8 curves. For surface area, hard compact thickness is 7.5 cm used asphalt concrete, sub base is 20 cm used split class A and base is 20 cm used sirtu class A. This road building was carried out within 113 days with a total fund Rp 34,542,339,400.00

Item Type: Thesis (Other)
Uncontrolled Keywords: In the planning design of geometric road, there are some references in planning include calculation of the horizontal alignment , vertical alignment, hard compact and define what that will be used. As the results of calculations, Tangerang – Cipondoh street is classificate to class II A road with planning speed 70 km/hour, and this road used 8 curves. For surface area, hard compact thickness is 7.5 cm used asphalt concrete, sub base is 20 cm used split class A and base is 20 cm used sirtu class A. This road building was carried out within 113 days with a total fund Rp 34,542,339,400.00
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TK Electrical engineering. Electronics Nuclear engineering
Divisions: Civil Engineering > Undergraduate Theses
Depositing User: Mrs Trisni Handayani
Date Deposited: 18 Nov 2015 08:45
Last Modified: 18 Nov 2015 08:45
URI: http://eprints.polsri.ac.id/id/eprint/1720

Actions (login required)

View Item View Item