ANALISA KEANDALAN RELAI JARAK SEBAGAI PENGAMAN UTAMA PADA SALURAN UDARA TEGANGAN TINGGI 70 KV DI GARDU INDUK BOOM BARU – SEDUDUK PUTIH

JULIANSYAH, ANGGA (2015) ANALISA KEANDALAN RELAI JARAK SEBAGAI PENGAMAN UTAMA PADA SALURAN UDARA TEGANGAN TINGGI 70 KV DI GARDU INDUK BOOM BARU – SEDUDUK PUTIH. Other thesis, Politeknik Negeri Sriwijaya.

[img]
Preview
Text (COVER)
COVER.pdf

Download (116kB) | Preview
[img]
Preview
Text (BAB I PENDAHULUAN)
BAB-1.pdf

Download (54kB) | Preview
[img]
Preview
Text (BAB II TINJAUAN PUSTAKA)
BAB-2.pdf

Download (346kB) | Preview
[img] Text (BAB III KEADAAN UMUM)
BAB-3.pdf
Restricted to Repository staff only

Download (931kB)
[img] Text (BAB IV PEMBAHASAN)
BAB-4.pdf
Restricted to Repository staff only

Download (135kB)
[img]
Preview
Text (BAB V KESIMPULAN DAN SARAN)
BAB-5.pdf

Download (47kB) | Preview
[img]
Preview
Text (DAFTAR PUSTAKA)
DAFTAR-PUSTAKA.pdf

Download (21kB) | Preview

Abstract

The final report entitled “The Analysis Of Distance Relay Reliability As A Main Protection On High Voltage 70 kV At Boom Baru – Seduduk Putih Substation”. The purpose of this final report are knowing the procedure of distance relay, the setting calculation of distance relay dan determine whether the distance relays at Boom Baru substations is reliable or not. The data collection method are used observation and interviews. Data obtained from Transmission Service Unit (UPT) PT. PLN (Persero) Palembang and Boom Baru substations. The procedure of distance relay is the relay will trip when the value of impedance due to the interference is smaller than the impedance setting of distance relays at Boom Baru substations. Setting value obtained from calculation is zone 1 of 0.15 ∠ 55.7 ° with time of 0 seconds, zone 2 at 0.2232 ∠ 55.7 ° with time of 0.4

Item Type: Thesis (Other)
Uncontrolled Keywords: The data collection method are used observation and interviews. Data obtained from Transmission Service Unit (UPT) PT. PLN (Persero) Palembang and Boom Baru substations. The procedure of distance relay is the relay will trip when the value of impedance due to the interference is smaller than the impedance setting of distance relays at Boom Baru substations. Setting value obtained from calculation is zone 1 of 0.15 ∠ 55.7 ° with time of 0 seconds, zone 2 at 0.2232 ∠ 55.7 ° with time of 0.4
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering
Divisions: Electrical Engineering > Undergraduate Theses
Depositing User: Mrs Trisni Handayani
Date Deposited: 03 Nov 2015 07:50
Last Modified: 03 Nov 2015 07:50
URI: http://eprints.polsri.ac.id/id/eprint/1741

Actions (login required)

View Item View Item