ANALISA PENGGUNAAN GARDU SISIPAN PADA PENYULANG HARIMAU UNTUK MEMINIMALISIR SUSUT TEKNIS DENGAN APLIKASI ETAP 12.6.0 DI PT.PLN (PERSERO) RAYON RIVAI PALEMBANG

Lestari, Citra Afri (2015) ANALISA PENGGUNAAN GARDU SISIPAN PADA PENYULANG HARIMAU UNTUK MEMINIMALISIR SUSUT TEKNIS DENGAN APLIKASI ETAP 12.6.0 DI PT.PLN (PERSERO) RAYON RIVAI PALEMBANG. Other thesis, Politeknik Negeri Sriwijaya.

[img]
Preview
Text (COVER)
COVER.pdf

Download (90kB) | Preview
[img]
Preview
Text (BAB I PENDAHULUAN)
BAB I.pdf

Download (34kB) | Preview
[img]
Preview
Text (BAB II TINJAUAN PUSTAKA)
BAB II.pdf

Download (398kB) | Preview
[img] Text (BAB III METODOLOGI PENELITIAN)
BAB III.pdf
Restricted to Repository staff only

Download (355kB)
[img] Text (BAB IV PEMBAHASAN)
BAB IV.pdf
Restricted to Repository staff only

Download (598kB)
[img]
Preview
Text (BAB V KESIMPULAN DAN SARAN)
BAB V.pdf

Download (23kB) | Preview
[img]
Preview
Text (DAFTAR PUSTAKA)
DAFTAR PUSTAKA.pdf

Download (12kB) | Preview

Abstract

The customers always growing up in each time. So, automatically the transformer load will growing up too. That’s why the transforer is not any longer to carry the load that over capacity. So to anticipate it, distribution transformer code I.258 and I.845 we can install the additional transformer in there.This report is made to investigates how large the capacity of distribution transformer load and power losses before and after installating of additional substation.This report also comparing the manual calculation with the calculation based ETAP 12.6.0 apllication. Based on measuring date and calculation result, we can decided that installation of addition transformer can minimize the power losses. It can be proved by this calculation result. Based on the ETAP the power losses of distribution substation code I.258 before installating PAA 659 is 7,5 kW. Meanwhile, at distribution substation code I.845 is 10,6 kW. But, after installating additional transformer PAA 659 there is decreasing the power losses at distribution substation code I.258 is 6,8 kW and at distribution substation code I.845 is 8,4 Kw. Keywords : power losses, additional substation

Item Type: Thesis (Other)
Uncontrolled Keywords: power losses, additional substation
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering
Divisions: Electrical Engineering > Undergraduate Theses
Depositing User: Mrs Trisni Handayani
Date Deposited: 03 Nov 2015 07:50
Last Modified: 03 Nov 2015 07:50
URI: http://eprints.polsri.ac.id/id/eprint/1742