Sanzarian, Yogi (2015) KOORDINASI RELE ARUS LEBIH DAN RELE GANGGUAN TANAH MENGGUNAKAN PROGRAM BERBASIS ELECTRIC TRANSIENT AND ANALYSIS PROGRAM (ETAP) PADA GARDU INDUK BUNGARAN DI PT. PLN (PERSERO) UPT PALEMBANG. Other thesis, Politeknik Negeri Sriwijaya.
|
Text (COVER)
cover.pdf Download (451kB) | Preview |
|
|
Text (BAB I PENDAHULUAN)
bab I.pdf Download (114kB) | Preview |
|
|
Text (BAB II TINJAUAN PUSTAKA)
bab II.pdf Download (1MB) | Preview |
|
![]() |
Text (BAB III METODELOGI PENELITIAN)
bab III.pdf Restricted to Repository staff only Download (713kB) |
|
![]() |
Text (BAB IV PEMBAHASAN)
bab IV.pdf Restricted to Repository staff only Download (2MB) |
|
|
Text (BAB V KESIMPULAN DAN SARAN)
bab V.pdf Download (97kB) | Preview |
|
|
Text (DAFTAR PUSTAKA)
daftar pustaka.pdf Download (199kB) | Preview |
Abstract
KOORDINASI RELE ARUS LEBIH DAN RELE GANGGUAN TANAH MENGGUNAKAN PROGRAM BERBASIS ELECTRIC TRANSIENT AND ANALYSIS PROGRAM (ETAP) PADA GARDU INDUK BUNGARAN DI PT. PLN (PERSERO) UPT PALEMBANG
Item Type: | Thesis (Other) |
---|---|
Uncontrolled Keywords: | over current relay, ground fault relay, setting of current and timing relay, simulation on software ETAP 12.6.0 |
Subjects: | T Technology > TK Electrical engineering. Electronics Nuclear engineering |
Divisions: | Electrical Engineering > Undergraduate Theses |
Depositing User: | Mrs Trisni Handayani |
Date Deposited: | 03 Nov 2015 07:50 |
Last Modified: | 03 Nov 2015 07:50 |
URI: | http://eprints.polsri.ac.id/id/eprint/1743 |
Actions (login required)
![]() |
View Item |