MUHAMMAD, IBNU IKHRAR and M., ALDI MAULANA and M., FANNY FADELI (2016) PERENCANAAN BANGUNAN PELENGKAP PADA JARINGAN IRIGASI SALURAN SUB SEKUNDER SUMBER AGUNG SELATAN BLOK D KABUPATEN OGAN KOMERING ILIR SUMATERA SELATAN. Other thesis, POLITEKNIK NEGERI SRIWIJAYA.
|
Text (Cover)
DAFTAR ISI.pdf Download (495kB) | Preview |
|
|
Text (BAB I Pendahuluan)
BAB I.pdf Download (273kB) | Preview |
|
|
Text (BAB II Tinjauan Pustaka)
BAB II.pdf Download (690kB) | Preview |
|
![]() |
Text (BAB III Perhitungan Perencanaan)
BAB III 2003 baru.pdf Restricted to Repository staff only Download (908kB) |
|
![]() |
Text (BAB IV Manajemen Proyek)
BAB IV PART 1.pdf Restricted to Repository staff only Download (166kB) |
|
![]() |
Text (BAB IV Syarat-syarat Teknis)
BAB IV PART 2.pdf Restricted to Repository staff only Download (1MB) |
|
![]() |
Other (RAB)
RAB FANNY ALDI IBNU.xlsx Download (396kB) |
|
|
Text (BAB V Penutup)
BAB V.pdf Download (11kB) | Preview |
|
|
Text
DAFTAR PUSTAKA.pdf Download (11kB) | Preview |
Abstract
To support and increase the food production in OganKomeringIlir district, There are are some ways to do that, one of them is the planning and construction of irrigation sub-secondary canal in South of SumberAgung village, Lempuing. This final report contains the irrigation network planning, canal’s dimensions planning, aqueduct’s planning, planning of off-take in tertiary canal with Romijn gate or Crump-de Gruyter gate, dropsctructre’s planning, syphon’s planning, box-culvert’s planning, cost budget plancalculation, along with other components such as the project management concering the implementationnetwork planningschedule, explementation of technical specifications and construction jobs drawings. The planning of irrigation network is planned to meet or this final report includes rainfall data, map, and others. This project used method of Aljabar, Pen Man method, and others. Based on calculations derived dimensions of trafezoid-shaped primary channel which sub-secondary 4, Q = 0,742 m3/det; b = 1,5 m; h = 0,74 m; V = 0,45 m/det/l; I = 0,0004558m. Sub-secondary 5, b = 1,3 m; h = 0,67 m; V = 0,5 m/det/l; I =0,0005595 m. Sub-secondary 6,Q = 0,4 m b = 0,7 m; h = 0,71 m; V = 0,4 m/det/l; I = 0,0004994m. This project requires Rp7,507,334,296– of budgets (Seven billion, five hundred and seven million, three hundred and thirty four, two hundred and ninety six rupiahs).
Item Type: | Thesis (Other) |
---|---|
Uncontrolled Keywords: | Pintu Romijn atau Crump-de, Network Planning |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Civil Engineering > Undergraduate Theses |
Depositing User: | Mrs Trisni Handayani |
Date Deposited: | 30 Mar 2017 08:51 |
Last Modified: | 30 Mar 2017 08:51 |
URI: | http://eprints.polsri.ac.id/id/eprint/3369 |
Actions (login required)
![]() |
View Item |