PERENCANAAN BANGUNAN PELENGKAP PADA JARINGAN IRIGASI SALURAN SUB SEKUNDER SUMBER AGUNG SELATAN BLOK D KABUPATEN OGAN KOMERING ILIR SUMATERA SELATAN

MUHAMMAD, IBNU IKHRAR and M., ALDI MAULANA and M., FANNY FADELI (2016) PERENCANAAN BANGUNAN PELENGKAP PADA JARINGAN IRIGASI SALURAN SUB SEKUNDER SUMBER AGUNG SELATAN BLOK D KABUPATEN OGAN KOMERING ILIR SUMATERA SELATAN. Other thesis, POLITEKNIK NEGERI SRIWIJAYA.

[img]
Preview
Text (Cover)
DAFTAR ISI.pdf

Download (495kB) | Preview
[img]
Preview
Text (BAB I Pendahuluan)
BAB I.pdf

Download (273kB) | Preview
[img]
Preview
Text (BAB II Tinjauan Pustaka)
BAB II.pdf

Download (690kB) | Preview
[img] Text (BAB III Perhitungan Perencanaan)
BAB III 2003 baru.pdf
Restricted to Repository staff only

Download (908kB)
[img] Text (BAB IV Manajemen Proyek)
BAB IV PART 1.pdf
Restricted to Repository staff only

Download (166kB)
[img] Text (BAB IV Syarat-syarat Teknis)
BAB IV PART 2.pdf
Restricted to Repository staff only

Download (1MB)
[img] Other (RAB)
RAB FANNY ALDI IBNU.xlsx

Download (396kB)
[img]
Preview
Text (BAB V Penutup)
BAB V.pdf

Download (11kB) | Preview
[img]
Preview
Text
DAFTAR PUSTAKA.pdf

Download (11kB) | Preview

Abstract

To support and increase the food production in OganKomeringIlir district, There are are some ways to do that, one of them is the planning and construction of irrigation sub-secondary canal in South of SumberAgung village, Lempuing. This final report contains the irrigation network planning, canal’s dimensions planning, aqueduct’s planning, planning of off-take in tertiary canal with Romijn gate or Crump-de Gruyter gate, dropsctructre’s planning, syphon’s planning, box-culvert’s planning, cost budget plancalculation, along with other components such as the project management concering the implementationnetwork planningschedule, explementation of technical specifications and construction jobs drawings. The planning of irrigation network is planned to meet or this final report includes rainfall data, map, and others. This project used method of Aljabar, Pen Man method, and others. Based on calculations derived dimensions of trafezoid-shaped primary channel which sub-secondary 4, Q = 0,742 m3/det; b = 1,5 m; h = 0,74 m; V = 0,45 m/det/l; I = 0,0004558m. Sub-secondary 5, b = 1,3 m; h = 0,67 m; V = 0,5 m/det/l; I =0,0005595 m. Sub-secondary 6,Q = 0,4 m b = 0,7 m; h = 0,71 m; V = 0,4 m/det/l; I = 0,0004994m. This project requires Rp7,507,334,296– of budgets (Seven billion, five hundred and seven million, three hundred and thirty four, two hundred and ninety six rupiahs).

Item Type: Thesis (Other)
Uncontrolled Keywords: Pintu Romijn atau Crump-de, Network Planning
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Civil Engineering > Undergraduate Theses
Depositing User: Mrs Trisni Handayani
Date Deposited: 30 Mar 2017 08:51
Last Modified: 30 Mar 2017 08:51
URI: http://eprints.polsri.ac.id/id/eprint/3369

Actions (login required)

View Item View Item