SIMANJUNTAK, APRILIYANTI LETARE and ARYANTI, IRMA AMELIA PUTRI (2016) PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN LENTUR PADA RUAS JALAN SP. RAMBUTAN – TULUNG SELAPAN KABUPATEN OGAN KOMERING ILIR PROVINSI SUMATERA SELATAN (STA 9+450–STA 14+580,4). Other thesis, POLITEKNIK NEGERI SRIWIJAYA.
|
Text
COVER.pdf Download (519kB) | Preview |
|
|
Text
BAB 1 PENDAHULUAN.pdf Download (96kB) | Preview |
|
|
Text
BAB 2 TINJAUAN PUSTAKA.pdf Download (2MB) | Preview |
|
![]() |
Text
BAB 3 PERHITUNGAN GEOMETRIK DAN TEBAL PERKERASAN.pdf Restricted to Repository staff only Download (1MB) |
|
![]() |
Text
BAB 4 PENGELOLAAN PROYEK.pdf Restricted to Repository staff only Download (1MB) |
|
|
Text
BAB 5 PENUTUP.pdf Download (157kB) | Preview |
|
|
Text
DAFTAR PUSTAKA.pdf Download (69kB) | Preview |
|
|
Text (Perhitungan Perkerasan Jalan)
lampiran.pdf Download (26MB) | Preview |
Abstract
Variety of reasons to build the road, one of which is the result of socio-economic development. For it is through this final report, the author would like to know how the planning and design of geometric and pavement thickness on road SP. Rambutan – Tulung Selapan Ogan Komering Ilir, so that the road will be able to give a sense of security, convenient, and economical way for the user. In the planning of road geometric design, there are things become reference designs which includes the calculation of the horizontal alignment, vertical alignment, and define what it will be used. From the result of above calculation, so SP. Ramutan – Tulung Selapan Kabupaten Ogan Komering Ilir is a class II A road with the speed of the road plans 60 km/hour, and this road used 8 curves including, 2 full circle, 2 spiral-spiral, and 4 spiral-circle-spiral. Road surface layer using worn asphalt concrete by thick layer of 7 cm, asphalt concrete between with thick layer of 8 cm, and foundation asphalt concrete with thick layer of 15 cm. for the base layer used aggregate class A with a thick layer of 15 cm, while the sub base layer is used to aggregate class B with a thick layer of 15 cm. This road building was carried out within 110 days with a total coast Rp. 70.080.514.000,00,-.
Item Type: | Thesis (Other) |
---|---|
Uncontrolled Keywords: | Tikungan Full-Circle, Tikungan Spiral-Spiral, Tikungan Spiral-Circle-Spiral, Alinyemen Horizontal, Alinyemen Vertikal, Tebal Perkerasan, Rencana Anggaran Biaya |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Civil Engineering > Undergraduate Theses |
Depositing User: | Mrs Trisni Handayani |
Date Deposited: | 27 Apr 2017 02:04 |
Last Modified: | 27 Apr 2017 02:04 |
URI: | http://eprints.polsri.ac.id/id/eprint/3419 |