UTAMI, CITRA and FALAH, M. ICHAWANUL (2016) DESAIN SISTEM JARINGAN PIPA DISTRIBUSI AIR BERSIH KECAMATAN ILIR BARAT II PALEMBANG. Other thesis, POLITEKNIK NEGERI SRIWIJAYA.
|
Text
COVER.pdf Download (604kB) | Preview |
|
|
Text
BAB I.pdf Download (158kB) | Preview |
|
|
Text
BAB II .pdf Download (492kB) | Preview |
|
![]() |
Text (BAB III Perhitungan)
BAB III .pdf Restricted to Repository staff only Download (3MB) |
|
![]() |
Text (BAB IV Pengelolaan Proyek)
BAB IV.pdf Restricted to Repository staff only Download (796kB) |
|
|
Text
BAB V.pdf Download (152kB) | Preview |
|
|
Text
DAFTAR PUSTAKA.pdf Download (7kB) | Preview |
Abstract
District Ilir Barat II Palembang has 622,00 Ha area, with population growth and infrastructure is increasing from year to year, thereby also increasing the need for clean water, but in the provision of clean water that is less well served. For it is necessary to review the water distribution network system, which aims to find out how much water discharge to be flown on the matter, so that clean water needs are met equally. Water distribution networks are designed using calculations Manning- Gauckler-Strickler. To calculate the population projections used in the next 10 years the arithmetic, Geometric and exponential method, from the calculations, the amount of water required at district Ilir Barat II, then made a calculation on each element of the discharge pipe network using the Hardy Cross method. From the calculation of the projected number of serving residents at District Ilir Barat II are 88.803 people until the year 2025. Total discharge of clean water needs in 2015 at 108,27 liter/second and total discharge in 2025 at 193,42 liter/second. Thus necessary to discharge the addition of 85,15 liter/second to achieve clean water needs by 2025. From the calculation of budget plan to improving water distribution system needs fund Rp 19.575.600.000,00 with 138 working days.
Item Type: | Thesis (Other) |
---|---|
Uncontrolled Keywords: | Jaringan Distribusi Air, Metode Hardy Cross |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Civil Engineering > Undergraduate Theses |
Depositing User: | Mrs Trisni Handayani |
Date Deposited: | 11 Jul 2017 02:39 |
Last Modified: | 11 Jul 2017 02:39 |
URI: | http://eprints.polsri.ac.id/id/eprint/3672 |
Actions (login required)
![]() |
View Item |