PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN KAKU RUAS JALAN BATAS KOTA PALEMBANG – KAYU AGUNG STA 25+400 – STA 31+940 PROVINSI SUMATERA SELATAN

PRAMONO, INDRA and RIANSYAH, PEBRI KIKI and SARI, YORISKA INDAH (2016) PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN KAKU RUAS JALAN BATAS KOTA PALEMBANG – KAYU AGUNG STA 25+400 – STA 31+940 PROVINSI SUMATERA SELATAN. Other thesis, POLITEKNIK NEGERI SRIWIJAYA.

[img]
Preview
Text
1.Cover.pdf

Download (676kB) | Preview
[img]
Preview
Text
2.BAB I TA.pdf

Download (202kB) | Preview
[img]
Preview
Text
3.BAB II TA.pdf

Download (2MB) | Preview
[img] Text (BAB III Perhitungan Konstruksi)
4.BAB III TA.pdf
Restricted to Repository staff only

Download (1MB)
[img] Text (BAB IV Manajemen Proyek)
5.BAB IV TA.pdf
Restricted to Repository staff only

Download (1MB)
[img]
Preview
Text
5.BAB IV TA.pdf

Download (1MB) | Preview
[img]
Preview
Text
6.BAB V TA.pdf

Download (116kB) | Preview
[img]
Preview
Text
7.pustaka.pdf

Download (87kB) | Preview

Abstract

The road has a very important role in promoting economic growth both locally and nationally. In writing this final project, the writer wanted to know how good planning in planning the geometric design, pavement thickness, and complementary buildings on Palembang-KayuAgung border street, so the path that will be passed to provide a sense of security, convenient and economical for users. In planning the design geometrical highway, things become a reference in planning includes the calculation of horizontal alignment, vertical alignment, pavement establish what is used, complementary building planning and project management. From the results of the calculations above, Jalan Palembang City Limits grand-Wood is a first class Arteri road with speed design of 70 km/h, and in this way using 6 pieces bend. Layers of the road surface using AC-WC layer with a thickness of 5 cm, using cement concrete pavement with 30 cm thick, cement concrete base course (Lean Mix-Concrete) with a thick layer of 12.5 cm while the aggregate base course under class B with thick layer 15 cm. The construction of this road implemented within 284 days with a total fund of Rp 100,892,033,009.00 (One Billion Eight Hundred Ninety Two Million Thirty-three Thousand Nine Rupiah).

Item Type: Thesis (Other)
Uncontrolled Keywords: Beton semen (Learn Mix-Concrete), Lapis AC-WC
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Civil Engineering > Undergraduate Theses
Depositing User: Mrs Trisni Handayani
Date Deposited: 26 Jul 2017 03:02
Last Modified: 26 Jul 2017 03:02
URI: http://eprints.polsri.ac.id/id/eprint/3771

Actions (login required)

View Item View Item