ANANDA, LUTHFIAWANTI (2016) RANCANG BANGUN PROGRESSIVE TOOL PLAT KLEM U TIANG PIPA ANTENA 1 INCI (BIAYA PRODUKSI). Other thesis, POLITEKNIK NEGERI SRIWIJAYA.
|
Text
Cover.pdf Download (199kB) | Preview |
|
|
Text
BAB I.pdf Download (93kB) | Preview |
|
|
Text
BAB II.pdf Download (1MB) | Preview |
|
![]() |
Text (BAB III Perhitungan Perancangan (Pembahasan))
BAB III.pdf Restricted to Repository staff only Download (1MB) |
|
![]() |
Text (BAB IV Biaya Produksi)
BAB IV.pdf Restricted to Repository staff only Download (156kB) |
|
|
Text
BAB V.pdf Download (85kB) | Preview |
|
|
Text
DAFTAR PUSTAKA.pdf Download (77kB) | Preview |
Abstract
This report discusses about "Design of Progressive tool metal sheet clamp U for antenna pipe support 1 inch". The purpose of this final report is to know produce U clamp plate on the mast antenna pipe with a thickness of 1 mm and made of aluminum. At the U pipe clamp plate antenna there is a component that serves as pencekam. To produce plate in large quantities, use progressive press tool type tool. In making the clamp plate U process used are notching, pierching, parting, and bending in three stations. To design and manufacture, the important thing to note is the style of cutting and formation, clearance, dimension dies, the emphasis shank and the capacity of the press machine. Material products are aluminum alloy 3000 series with 1mm thick. Thecapacity of the machine used are 8 tons based on the calculation of the total force press tool, which amount to 6.8 tons 68307,312N.
Item Type: | Thesis (Other) |
---|---|
Uncontrolled Keywords: | Klem U, Progressive tool, Notching, Pierching, Parting, Bending |
Subjects: | T Technology > TJ Mechanical engineering and machinery |
Divisions: | Mechanical Engineering > Undergraduate Theses |
Depositing User: | Mrs Trisni Handayani |
Date Deposited: | 01 Aug 2017 10:16 |
Last Modified: | 01 Aug 2017 10:16 |
URI: | http://eprints.polsri.ac.id/id/eprint/3849 |
Actions (login required)
![]() |
View Item |