EVALUASI PENGGUNAAN DAYA LISTRIK PAD¬A KANTOR PUSAT ADMINISTRASI ( KPA ) POLITEKNIK NEGERI SRIWIJAYA PALEMBANG

PEBRIYANTI, FITRI (2017) EVALUASI PENGGUNAAN DAYA LISTRIK PAD¬A KANTOR PUSAT ADMINISTRASI ( KPA ) POLITEKNIK NEGERI SRIWIJAYA PALEMBANG. Other thesis, POLITEKNIK NEGERI SRIWIJAYA.

[img]
Preview
Text (Cover)
File I.pdf

Download (69kB) | Preview
[img]
Preview
Text (BAB I Pendahuluan)
File II.pdf

Download (39kB) | Preview
[img]
Preview
Text (BAB II Tinjauan Pustaka)
File III.pdf

Download (509kB) | Preview
[img] Text (BAB III Metodologi Penelitian)
File IV.pdf
Restricted to Repository staff only

Download (495kB) | Request a copy
[img] Text (BAB IV Pembahasan)
File V. 1.pdf
Restricted to Repository staff only

Download (319kB) | Request a copy
[img] Text (BAB IV Pembahasan)
File V. 2.pdf
Restricted to Repository staff only

Download (190kB) | Request a copy
[img] Text (BAB IV Pembahasan)
File V. 3.pdf
Restricted to Repository staff only

Download (49kB) | Request a copy
[img]
Preview
Text (BAB V Kesimpulan dan Saran)
File VI.pdf

Download (31kB) | Preview
[img]
Preview
Text (Daftar Pustaka)
File VII.pdf

Download (5kB) | Preview

Abstract

Administration Head Office (KPA) is one of the buildings contained in State Polytechnic of Sriwijaya.There are 3 floors which each floor has various activities every day as well as various load characteristics such as lighting load, cooling load / air conditioner (AC), electronic load and backup source in the form of socket. The operation of the load is not simultaneous so that its use of power will vary. To determine the use of electrical power in KPA then calculated load and current measurements to determine the load used. Measurements are done every Monday - Friday from 07.00 - 17.00 WIB since 13 - 24 March 2017. Based on current measurement results, theused power when the peak load condition is 110.030,8 Watt, the lowest load with the power of 57,427.7 Watt and the average load for two weeks is 77,557.93 WattHour. While the installed load is 258,467 Watts and the installed power capacity is 270,600 VA.

Item Type: Thesis (Other)
Uncontrolled Keywords: Kantor Pusat Administrasi, Evaluasi, Daya Terpakai
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering
Divisions: Electrical Engineering > Undergraduate Theses
Depositing User: Mrs Trisni Handayani
Date Deposited: 11 Apr 2018 04:53
Last Modified: 11 Apr 2018 04:53
URI: http://eprints.polsri.ac.id/id/eprint/4424

Actions (login required)

View Item View Item