RAHMINARITA, - (2014) ANALISIS PERHITUNGAN WAKTU DAN BIAYA PADA PEMBANGUNAN PERUMAHAN SURYA AKBAR II DENGAN METODE NETWORK PLANNING PADA PT SUMATERA MUDA PROPERTINDO PALEMBANG. Other thesis, Politeknik Negeri Sriwijaya.
|
Text (COVER)
FILE 1.pdf Download (462kB) | Preview |
|
|
Text (BAB I PENDAHULUAN)
FILE 2.pdf Download (81kB) | Preview |
|
|
Text (BAB II TINJAUAN PUSTAKA)
FILE 3.pdf Download (134kB) | Preview |
|
![]() |
Text (BAB III KEADAAN UMUM PERUSAHAAN)
FILE 4.pdf Restricted to Repository staff only Download (204kB) |
|
![]() |
Text (BAB IV HASIL DAN PEMBAHASAN)
FILE 5.pdf Restricted to Repository staff only Download (474kB) |
|
|
Text (BAB V KESIMPULAN DAN SARAN)
FILE 6.pdf Download (14kB) | Preview |
|
|
Text (DAFTAR PUSTAKA)
FILE 7.pdf Download (6kB) | Preview |
|
|
Text (LAMPIRAN)
FILE 8.pdf Download (2MB) | Preview |
Abstract
The final paper describes the calculation of production time and cost that required build one unit of type 36 dan type 45 houses by using Network Planning Method at Surya Akbar II, a project house developed by PT Sumatera Muda Propertindo Palembang. Previously, PT Sumatera Muda Propertindo Palembang has never used Network Planning Method in their construction projects. However, the company builds projects based solely on their estimates and experiences. Data were collected through interviews and analyzed using theories from the experts. Based on the calcuation result using Network Planning Method, it is found that to build one unit of type 36 house will take 44 days as the longest time (critical path) with production cost at Rp 40.766.000,-, while if build one unit of type 45 house will take 52 days as the longest time (critical path) with production cost at Rp 44.409.000,-. The final paper conclusion is by using Network Planning Method, the company will know how to calculate the most efficient of production time and cost for every project build. Keyword: Construction Calculation, Network Planning, and House.
Item Type: | Thesis (Other) |
---|---|
Uncontrolled Keywords: | Construction Calculation, Network Planning, and House. |
Subjects: | H Social Sciences > HB Economic Theory |
Divisions: | Business Administration > Undergraduate Theses |
Depositing User: | Mrs Trisni Handayani |
Date Deposited: | 21 Jan 2016 01:52 |
Last Modified: | 21 Jan 2016 01:52 |
URI: | http://eprints.polsri.ac.id/id/eprint/762 |
Actions (login required)
![]() |
View Item |