AFFANDY, ANDIKA AAD ARIF and SABRI, IKRIMA (2014) PENINGKATAN JALAN RAYA PAGAR ALAM – TANJUNG SAKTI STA 7+250 S/D 15+650. Other thesis, Politeknik Negeri Sriwijaya.
|
Text (COVER)
COVER.pdf Download (302kB) | Preview |
|
![]()
|
Text (BAB I PENDAHULUAN)
BAB I.pdf Download (21kB) | Preview |
|
![]()
|
Text (BAB II TINJAUAN PUSTAKA)
BAB II.pdf Download (578kB) | Preview |
|
![]() |
Text (BAB III PERHITUNGAN GEOMETRIK)
BAB III.pdf Restricted to Repository staff only Download (1MB) |
|
![]() |
Text (BAB IV MANAJEMEN PROYEK)
BAB IV.pdf Restricted to Repository staff only Download (1MB) |
|
|
Text (BAB V PENUTUP)
BAB V.pdf Download (10kB) | Preview |
|
|
Text (DAFTAR PUSTAKA)
Daftar Pustaka.pdf Download (7kB) | Preview |
|
![]() |
Other (Thumbnails conversion from text to thumbnail_small)
small.jpg Download (0B) |
Abstract
Road has a very important role in promoting economic growth both locally and nationally. In writing this final report, the authors wanted to know how good planning in planning geometric design, pavement thickness, and building appendages in Pagar Alam Road - Tanjung Sakti, so the path to be traversed can provide a sense of security, comfortable, and economical for road users. In the geometric design of highway planning, things area reference in planning in clued the calculation of horizontal alignment, vertical alignment, pavement establish what will be used, and complementary building planning. From the results of the calculations above, Pagar Alam Road – Tanjung Sakti is a road with a speed class II road plan 50 km/ h, and in this way using14 pieces bend. Layer of the road surface using Laston with 10 cm thick layer, the base layer of crushed stone using a class A with a 20 cm thick layer, while a layer of gravel subbase using a class A with a 35 cm thick layer and to use the overlay layer with a thickness of 7cm Laston. Construction of roads is carried out with in 224 days with a total fund of Rp72,500,000,000. Key words : Improvement, Road, Geometric, Pavement
Item Type: | Thesis (Other) |
---|---|
Uncontrolled Keywords: | Improvement, Road, Geometric, Pavement |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Civil Engineering > Undergraduate Theses |
Depositing User: | Mrs Trisni Handayani |
Date Deposited: | 02 Oct 2015 02:27 |
Last Modified: | 02 Oct 2015 02:27 |
URI: | http://eprints.polsri.ac.id/id/eprint/1206 |
Actions (login required)
![]() |
View Item |