Susandi, Alek and Astra Yudha, Ona (2014) PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN JALAN LINGKAR LUAR BARAT KOTA PALEMBANG BANYUASIN – JAKABARING PROVINSI SUMATERA SELATAN STA 0+000 – STA 5+250. Other thesis, Politeknik Negeri Sriwijaya.
|
Text (Cover)
Cover.pdf Download (141kB) | Preview |
|
|
Text (BAB I PENDAHULUAN)
BAB I.pdf Download (19kB) | Preview |
|
|
Text (BAB II TINJAUAN UMUM)
BAB II.pdf Download (20MB) | Preview |
|
![]() |
Text (BAB III PERHITUNGAN GEOMETRIK DAN PERKERASAN)
BAB III.pdf Restricted to Repository staff only Download (493kB) |
|
![]() |
Text (BAB IV PENGELOLAAN PROYEK)
BAB IV.pdf Restricted to Repository staff only Download (369kB) |
|
|
Text (BAB V PENUTUP)
BAB V.pdf Download (13kB) | Preview |
|
|
Text (DAFTAR PUSTAKA)
Daftar Pustaka.pdf Download (7kB) | Preview |
Abstract
The Road Lingkar Luar Barat Palembang City Banyuasin – Jakabaring street is a road that connects the Banyuasin and cross Jakabaring, this road has a very important role in promoting economic growth both locally and nationally. The final report this writing, the author would like to know how the planning and design of geometric and hard compact on Lingkar Luar Barat Palembang City Banyuasin – Jakabaring street, so that the road will be able to give a sense of security, convenient, and economical way for the user. In the planning design of geometric road, things become a reference in planning include the horizontal alinyemen calculation, vertical alinyemen, hard compact and define what that will be used. From the results of above calculations, so Lingkar Luar Barat Palembang City Banyuasin – Jakabaring street is a class II A road with the speed of the road plan 40 km/hour, and this road used 5 curves. For surface area hard compact thickness is 10 cm used asphalt concrete, sub base is 20 cm used split class A and base is 30 cm used sirtu class A. This road building was carried out within 182 days with a total fund Rp 49.763.033.000,00.
Item Type: | Thesis (Other) |
---|---|
Uncontrolled Keywords: | This road building was carried out within 182 days with a total fund Rp 49.763.033.000,00. |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Civil Engineering > Undergraduate Theses |
Depositing User: | Mr Bambang Anthony |
Date Deposited: | 02 Dec 2015 03:09 |
Last Modified: | 02 Dec 2015 03:09 |
URI: | http://eprints.polsri.ac.id/id/eprint/1295 |
Actions (login required)
![]() |
View Item |