RACHMI, BETARI and SIREGAR, WINDI MELINDA (2015) PERENCANAAN GEOMETRIK DAN PERKERASAN PADA RUAS JALAN LINGKAR BETUNG STA 0+000 – STA 5+036 PROVINSI SUMATERA SELATAN. Other thesis, Politeknik Negeri Sriwijaya.
|
Text (COVER)
FILE.pdf Download (446kB) | Preview |
|
|
Text (BAB I PENDAHULUAN)
BAB I.pdf Download (116kB) | Preview |
|
|
Text (BAB II TINJAUAN PUSTAKA)
BAB II.pdf Download (941kB) | Preview |
|
![]() |
Text (BAB III PERHITUNGAN GEOMETRIK DAN PERKERASAN)
BAB III.pdf Restricted to Repository staff only Download (1MB) |
|
![]() |
Text (BAB IV SPESIFIKASI TEKNIS)
BAB IV.pdf Restricted to Repository staff only Download (398kB) |
|
|
Text (BAB V PERHITUNGAN RENCANA ANGGARAN BIAYA)
BAB V.pdf Download (1MB) | Preview |
|
|
Text (BAB VI PENUTUP)
BAB VI.pdf Download (198kB) | Preview |
|
|
Text (DAFTAR PUSTAKA)
DAFTAR PUSTAKA.pdf Download (85kB) | Preview |
Abstract
Road construction is a vital necessity as the main supporter of economic activity both at central and regional levels. One is the area of Betung because the area are potential area for agribusiness and agro- industries. The final report this writing, the author would like to know how the planning and design of geometric and consrtuction pavement on The Road Lingkar Betung STA 0+000 - STA 5+036, so thatthe road will be able to give a sense of security, convenient, and economical way for the user. In the planning design of geometric road, things become a reference in planning include the horizontal alignment calculation, vertical alignment, hard compact and define what that will be used. From the results of above calculations, so The Road Lingkar Betung is a road with the speed of the road plan 80 km/hour, and this road used 6 curves including 2 Spiral-Spiral and 4 Spiral Circle Spiral. For surface area hard compact thickness is 7 cm used asphalt concrete, sub base is 15 cm used split class A and base is 21 cm used sirtu class B. This road building was carried out within 112 days with a total fund IDR. 52.464.500.000.
Item Type: | Thesis (Other) |
---|---|
Uncontrolled Keywords: | From the results of above calculations, so The Road Lingkar Betung is a road with the speed of the road plan 80 km/hour, and this road used 6 curves including 2 Spiral-Spiral and 4 Spiral Circle Spiral. For surface area hard compact thickness is 7 cm used asphalt concrete, sub base is 15 cm used split class A and base is 21 cm used sirtu class B. This road building was carried out within 112 days with a total fund IDR. 52.464.500.000 |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Civil Engineering > Undergraduate Theses |
Depositing User: | Mrs Trisni Handayani |
Date Deposited: | 25 Nov 2015 01:26 |
Last Modified: | 25 Nov 2015 01:26 |
URI: | http://eprints.polsri.ac.id/id/eprint/1570 |
Actions (login required)
![]() |
View Item |