PERENCANAAN GEOMETRIK DAN PERKERASAN PADA RUAS JALAN LINGKAR BETUNG STA 0+000 – STA 5+036 PROVINSI SUMATERA SELATAN

RACHMI, BETARI and SIREGAR, WINDI MELINDA (2015) PERENCANAAN GEOMETRIK DAN PERKERASAN PADA RUAS JALAN LINGKAR BETUNG STA 0+000 – STA 5+036 PROVINSI SUMATERA SELATAN. Other thesis, Politeknik Negeri Sriwijaya.

[img]
Preview
Text (COVER)
FILE.pdf

Download (446kB) | Preview
[img]
Preview
Text (BAB I PENDAHULUAN)
BAB I.pdf

Download (116kB) | Preview
[img]
Preview
Text (BAB II TINJAUAN PUSTAKA)
BAB II.pdf

Download (941kB) | Preview
[img] Text (BAB III PERHITUNGAN GEOMETRIK DAN PERKERASAN)
BAB III.pdf
Restricted to Repository staff only

Download (1MB)
[img] Text (BAB IV SPESIFIKASI TEKNIS)
BAB IV.pdf
Restricted to Repository staff only

Download (398kB)
[img]
Preview
Text (BAB V PERHITUNGAN RENCANA ANGGARAN BIAYA)
BAB V.pdf

Download (1MB) | Preview
[img]
Preview
Text (BAB VI PENUTUP)
BAB VI.pdf

Download (198kB) | Preview
[img]
Preview
Text (DAFTAR PUSTAKA)
DAFTAR PUSTAKA.pdf

Download (85kB) | Preview

Abstract

Road construction is a vital necessity as the main supporter of economic activity both at central and regional levels. One is the area of Betung because the area are potential area for agribusiness and agro- industries. The final report this writing, the author would like to know how the planning and design of geometric and consrtuction pavement on The Road Lingkar Betung STA 0+000 - STA 5+036, so thatthe road will be able to give a sense of security, convenient, and economical way for the user. In the planning design of geometric road, things become a reference in planning include the horizontal alignment calculation, vertical alignment, hard compact and define what that will be used. From the results of above calculations, so The Road Lingkar Betung is a road with the speed of the road plan 80 km/hour, and this road used 6 curves including 2 Spiral-Spiral and 4 Spiral Circle Spiral. For surface area hard compact thickness is 7 cm used asphalt concrete, sub base is 15 cm used split class A and base is 21 cm used sirtu class B. This road building was carried out within 112 days with a total fund IDR. 52.464.500.000.

Item Type: Thesis (Other)
Uncontrolled Keywords: From the results of above calculations, so The Road Lingkar Betung is a road with the speed of the road plan 80 km/hour, and this road used 6 curves including 2 Spiral-Spiral and 4 Spiral Circle Spiral. For surface area hard compact thickness is 7 cm used asphalt concrete, sub base is 15 cm used split class A and base is 21 cm used sirtu class B. This road building was carried out within 112 days with a total fund IDR. 52.464.500.000
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Civil Engineering > Undergraduate Theses
Depositing User: Mrs Trisni Handayani
Date Deposited: 25 Nov 2015 01:26
Last Modified: 25 Nov 2015 01:26
URI: http://eprints.polsri.ac.id/id/eprint/1570

Actions (login required)

View Item View Item