PRASETYO, MUHAMMAD TRI HADI (2015) RANCANG BANGUN SCISSORS LIFT KAPASITAS 150 KG (PERAWATAN PERBAIKKAN DAN BIAYA PRODUKSI). Other thesis, Politeknik Negeri Sriwijaya.
|
Text (COVER)
Cover.pdf Download (91kB) | Preview |
|
|
Text (BAB I PENDAHULUAN)
BAB I.pdf Download (27kB) | Preview |
|
|
Text (BAB II TINJAUAN PUSTAKA)
BAB II.pdf Download (236kB) | Preview |
|
![]() |
Text (BAB III PEMBAHASAN DAN PERHITUNGAN DESAIN)
BAB III.pdf Restricted to Repository staff only Download (1MB) |
|
![]() |
Text (BAB IV PERAWATAN, PERBAIKKAN DAN BIAYA PRODUKSI)
BAB IV.pdf Restricted to Repository staff only Download (94kB) |
|
|
Text (BAB V PENUTUP)
BAB V.pdf Download (15kB) | Preview |
|
|
Text (DAFTAR PUSTAKA)
DAFTAR PUSTAKA.pdf Download (19kB) | Preview |
Abstract
This report it contain about lift scissors machine build. The purpose of this report it was made this tools to make easy high reach helpng of work on the high condition wih bring burden and helped maintenance and repar tools because of has difficult highest that could by human. The work process of ths tools is to attacked hidrolic movement to up and under, so it will moving as vertical for mechanism it reach these thing is usage tool, supporting double “X” and accross type, that well known as pantograph (Scissor mechanism). This tools that used on these thing is hidrolic movement that able to reach 500 kg burden and platform weight about 200kg Kata kunci :Scissors Lift, Pantograph, Hidrolic scissor
Item Type: | Thesis (Other) |
---|---|
Uncontrolled Keywords: | Scissors Lift, Pantograph, Hidrolic scissor |
Subjects: | T Technology > TJ Mechanical engineering and machinery |
Divisions: | Mechanical Engineering > Undergraduate Theses |
Depositing User: | Mrs Trisni Handayani |
Date Deposited: | 19 Nov 2015 01:56 |
Last Modified: | 19 Nov 2015 01:56 |
URI: | http://eprints.polsri.ac.id/id/eprint/1645 |
Actions (login required)
![]() |
View Item |