RANCANG BANGUN SCISSORS LIFT KAPASITAS 150 KG (PERAWATAN PERBAIKKAN DAN BIAYA PRODUKSI)

PRASETYO, MUHAMMAD TRI HADI (2015) RANCANG BANGUN SCISSORS LIFT KAPASITAS 150 KG (PERAWATAN PERBAIKKAN DAN BIAYA PRODUKSI). Other thesis, Politeknik Negeri Sriwijaya.

[img]
Preview
Text (COVER)
Cover.pdf

Download (91kB) | Preview
[img]
Preview
Text (BAB I PENDAHULUAN)
BAB I.pdf

Download (27kB) | Preview
[img]
Preview
Text (BAB II TINJAUAN PUSTAKA)
BAB II.pdf

Download (236kB) | Preview
[img] Text (BAB III PEMBAHASAN DAN PERHITUNGAN DESAIN)
BAB III.pdf
Restricted to Repository staff only

Download (1MB)
[img] Text (BAB IV PERAWATAN, PERBAIKKAN DAN BIAYA PRODUKSI)
BAB IV.pdf
Restricted to Repository staff only

Download (94kB)
[img]
Preview
Text (BAB V PENUTUP)
BAB V.pdf

Download (15kB) | Preview
[img]
Preview
Text (DAFTAR PUSTAKA)
DAFTAR PUSTAKA.pdf

Download (19kB) | Preview

Abstract

This report it contain about lift scissors machine build. The purpose of this report it was made this tools to make easy high reach helpng of work on the high condition wih bring burden and helped maintenance and repar tools because of has difficult highest that could by human. The work process of ths tools is to attacked hidrolic movement to up and under, so it will moving as vertical for mechanism it reach these thing is usage tool, supporting double “X” and accross type, that well known as pantograph (Scissor mechanism). This tools that used on these thing is hidrolic movement that able to reach 500 kg burden and platform weight about 200kg Kata kunci :Scissors Lift, Pantograph, Hidrolic scissor

Item Type: Thesis (Other)
Uncontrolled Keywords: Scissors Lift, Pantograph, Hidrolic scissor
Subjects: T Technology > TJ Mechanical engineering and machinery
Divisions: Mechanical Engineering > Undergraduate Theses
Depositing User: Mrs Trisni Handayani
Date Deposited: 19 Nov 2015 01:56
Last Modified: 19 Nov 2015 01:56
URI: http://eprints.polsri.ac.id/id/eprint/1645

Actions (login required)

View Item View Item