HENDIKA, FERI (2016) RANCANG BANGUN ALAT BANTU PENGEBORAN BENDA MELINGKAR (PROSES PEMBUATAN ). Other thesis, POLITEKNIK NEGERI SRIWIJAYA.
|
Text
COVER.pdf Download (300kB) | Preview |
|
|
Text (BAB I Pendahuluan)
BAB I.pdf Download (204kB) | Preview |
|
|
Text (BAB II Tinjauan Pustaka)
BAB II.pdf Download (1MB) | Preview |
|
![]() |
Text (BAB III Perencanaan Alat)
BAB III.pdf Restricted to Repository staff only Download (406kB) |
|
![]() |
Text (BAB IV Proses Pembuatan)
BAB IV.pdf Restricted to Repository staff only Download (814kB) |
|
|
Text (BAB V Penutup)
BAB V.pdf Download (89kB) | Preview |
|
|
Text
Daftar Pustaka.pdf Download (85kB) | Preview |
Abstract
This final report entitled Design Tools Drilling Hole Center Point Circle. This final report is the final report of the tools for drilling with drill point circular shape, which will be used to process mass production. This tool has two threaded drive which serves to move the sledge that will be used to adjust the distance between the midpoint of the workpiece to the midpoint of the holes to be done drilling and has one screw which serves for gripping workpieces whereby the three screw are powered by the handle, which get the style of hand. In the manufacturing process design tools drilling center point of this circular hole using a casting process for some komponenya, using drilling machines, lathes, milling machines and tool bench work tools. The tool is there are still some drawbacks to it still needs to do some modifications to the work function of the tool can be optimized
Item Type: | Thesis (Other) |
---|---|
Uncontrolled Keywords: | Pengecoran, Mesin Bor, Mesin Bubut, Mesin Milling, Alat Perkakas Kerja Bangku |
Subjects: | T Technology > TJ Mechanical engineering and machinery |
Divisions: | Mechanical Engineering > Undergraduate Theses |
Depositing User: | Mrs Trisni Handayani |
Date Deposited: | 22 Feb 2017 02:21 |
Last Modified: | 22 Feb 2017 02:21 |
URI: | http://eprints.polsri.ac.id/id/eprint/3303 |
Actions (login required)
![]() |
View Item |