PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN LENTUR JALAN LINGKAR LUAR BARAT BANYUANSIN- JAKABARING STA 23+050 – STA 29+ 435 KOTA PALEMBANG

FAKARNITA, MIFTAH and PUSPITASARI, RODIAH (2016) PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN LENTUR JALAN LINGKAR LUAR BARAT BANYUANSIN- JAKABARING STA 23+050 – STA 29+ 435 KOTA PALEMBANG. Other thesis, POLITEKNIK NEGERI SRIWIJAYA.

[img]
Preview
Text
Cover.pdf

Download (451kB) | Preview
[img]
Preview
Text (BAB I Pendahuluan)
BAB I.pdf

Download (25kB) | Preview
[img]
Preview
Text (BAB II Tinjauan Pustaka)
BAB II.pdf

Download (2MB) | Preview
[img] Text (BAB III Perhitungan Geometrik)
BAB III.pdf
Restricted to Repository staff only

Download (1MB)
[img] Text (BAB IV Manajemen Proyek)
BAB IV.pdf
Restricted to Repository staff only

Download (1MB)
[img]
Preview
Text (BAB V Penutup)
BAB V.pdf

Download (187kB) | Preview
[img]
Preview
Text
Daftar Pustaka.pdf

Download (192kB) | Preview

Abstract

Banyuasin Road - Village is a road that connects between the the two villages, the road has a very important role in enhancing economic growth for the local area. In writing this final report, the authours would like to know how good planning in the planning and bold geometric design of road pavement on Lingkar Luar Barat Banyuasin-Jakabaring , so the path to be traversed can give a sense of safe, convenient, and economical for the road users. In planing a geometric design of higways, things become a reference in planning include the calculation of horizontal alignment, vertical alignment, and to determine what to use pavement. From the calculations above, Lingkar Luar Barat Banyuasin road at Jakabaring is a class II A street plan of the road with a speed of 60 km/h, and on this road using the bend 8 units. Surface AC-WC is 6 cm, surface AC-BC is 12 cm, surface AC-BASE is 21, the base layer using aggregate class A with a thickness of 15 cm, and the base layer below the aggregate class B with a thickness of 17 cm. The construction of this road implemented within 162 days with a total fund of Rp. 76.715.927.000,00 \

Item Type: Thesis (Other)
Uncontrolled Keywords: Perkerasan Lentur, Geometrik, Rencana Anggaran Biaya, Kecepatan
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Civil Engineering > Undergraduate Theses
Depositing User: Mrs Trisni Handayani
Date Deposited: 12 Apr 2017 02:15
Last Modified: 12 Apr 2017 02:15
URI: http://eprints.polsri.ac.id/id/eprint/3387

Actions (login required)

View Item View Item