Enhariz, M. Emirza (2014) PERHITUNGAN PEMBANGUNAN RAMBU SUAR TANJUNG API-API DENGAN MENGGUNAKAN METODE NETWORK PLANNING PADA CV ETERNITY NUSANTARA PALEMBANG. Other thesis, Politeknik Negeri Sriwijaya.
|
Text (COVER)
FILE 1.pdf Download (1MB) | Preview |
|
|
Text (BAB I PENDAHULUAN)
FILE 2.pdf Download (327kB) | Preview |
|
|
Text (BAB II Tinjauan Pustaka)
FILE 3.pdf Download (232kB) | Preview |
|
![]() |
Text (BAB III KEADAAN UMUM PERUSAHAAN)
FILE 4.pdf Restricted to Repository staff only Download (261kB) |
|
![]() |
Text (BAB IV PEMBAHASAN DAN HASIL)
FILE 5.pdf Restricted to Repository staff only Download (437kB) |
|
|
Text (BAB V KESIMPULAN DAN SARAN)
FILE 6.pdf Download (88kB) | Preview |
|
|
Text (DAFTAR PUSTAKA)
FILE 7.pdf Download (85kB) | Preview |
|
|
Text (LAMPIRAN)
FILE 8.pdf Download (7MB) | Preview |
Abstract
The final report describes the calculation of the construction rambu suar tanjung api-api by using network planning method at CV Eternity Nusantara Palembang. CV Eternity Nusantara has never used network planning method in planning time and cost required. The purpose of this report is to determine the role of network planning in achieving time and cost optimal project. The benefits of this report is can save time and cost of the project. The type of data source that was used in the writing of this report is primary data and secondary data. The results of this report is by using network planning which generates an optimal time for 142 days with a total cost of project is Rp 2.025.899.256, different from the planning by the contractor as CV Eternity is for 180 days with a total cost of project is Rp 2.202.530.091. Therefore, writer suggested CV Eternity Nusantara Palembang to using network planning methods in the implementation of the project
Item Type: | Thesis (Other) |
---|---|
Uncontrolled Keywords: | The benefits of this report is can save time and cost of the project. The type of data source that was used in the writing of this report is primary data and secondary data |
Subjects: | H Social Sciences > HB Economic Theory |
Divisions: | Business Administration > Undergraduate Theses |
Depositing User: | Mrs Trisni Handayani |
Date Deposited: | 21 Jan 2016 01:46 |
Last Modified: | 21 Jan 2016 01:46 |
URI: | http://eprints.polsri.ac.id/id/eprint/805 |
Actions (login required)
![]() |
View Item |