PERHITUNGAN PEMBANGUNAN RAMBU SUAR TANJUNG API-API DENGAN MENGGUNAKAN METODE NETWORK PLANNING PADA CV ETERNITY NUSANTARA PALEMBANG

Enhariz, M. Emirza (2014) PERHITUNGAN PEMBANGUNAN RAMBU SUAR TANJUNG API-API DENGAN MENGGUNAKAN METODE NETWORK PLANNING PADA CV ETERNITY NUSANTARA PALEMBANG. Other thesis, Politeknik Negeri Sriwijaya.

Full text not available from this repository.

Abstract

The final report describes the calculation of the construction rambu suar tanjung api-api by using network planning method at CV Eternity Nusantara Palembang. CV Eternity Nusantara has never used network planning method in planning time and cost required. The purpose of this report is to determine the role of network planning in achieving time and cost optimal project. The benefits of this report is can save time and cost of the project. The type of data source that was used in the writing of this report is primary data and secondary data. The results of this report is by using network planning which generates an optimal time for 142 days with a total cost of project is Rp 2.025.899.256, different from the planning by the contractor as CV Eternity is for 180 days with a total cost of project is Rp 2.202.530.091. Therefore, writer suggested CV Eternity Nusantara Palembang to using network planning methods in the implementation of the project

Item Type: Thesis (Other)
Uncontrolled Keywords: The benefits of this report is can save time and cost of the project. The type of data source that was used in the writing of this report is primary data and secondary data
Subjects: H Social Sciences > HB Economic Theory
Divisions: Business Administration > Undergraduate Theses
Depositing User: Mrs Trisni Handayani
Date Deposited: 21 Jan 2016 01:46
Last Modified: 21 Jan 2016 01:46
URI: http://eprints.polsri.ac.id/id/eprint/805

Actions (login required)

View Item View Item