Arfy, M.Caisar and Pertiwi, Rima (2013) PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN PADA JALAN SP. MERANJAT - BATAS KAB. MUARA ENIM PROVINSI SUMATERA SELATAN STA 26+000 s/d STA 31+000. Other thesis, Politeknik Negeri Sriwijaya.
|
Text (Cover)
Cover Fix.pdf Download (164kB) | Preview |
|
|
Text (Bab I Pendahuluan)
BAB_I.pdf Download (120kB) | Preview |
|
|
Text (Bab II Landasan Teori)
BAB_II.pdf Download (838kB) | Preview |
|
![]() |
Text (Bab III Perhitungan Konstruksi)
BAB_III.pdf Restricted to Repository staff only Download (655kB) |
|
![]() |
Text (Bab IV PENGELOLAAN PROYEK )
BAB_IV.pdf Restricted to Repository staff only Download (434kB) |
|
|
Text (Bab V Kesimpulan dan SaranDaftar)
BAB_V.pdf Download (104kB) | Preview |
|
|
Text (Daftar Pustaka)
DAFTAR_PUSTAKA.pdf Download (50kB) | Preview |
Abstract
ABSTRACT Topics that the authors take on the final report is Planning Geometric and Thickness Pavement Design on the road Simpang Meranjat – Batas Kabupaten Muara Enim South Sumatra Province Sta. 26+000 – Sta. 31+000. The purpose of this project is to increase economical growth both local and national. Also useful for launching all the activities of Develompment as a whole, the writer makes The Planning Geometric and Thickness Pavement Design on the road Simpang Meranjat – Batas Kabupaten Muara Enim South Sumatra Province. Benefits that can be taken is by the results of the final report is expected to authors and readers can understand more about planning a bold geometric and pavement. So as to create a suitable road to the traffic conditions at this time until the moment that will come. In planning geometric highway design, the things that become a guidance in planning such as the calculation of traffic growth rates determination of point coordinates, distance, Angle Between Two Tangen (Δ), Horizontal alignment, Vertical alignment and Pavement Thickness. Further calculations proceed by calculating the volume and the total cost of jobs in a Budget Plan. From the results of above calculations, street is a class II B road with the spees of the road plan 40 km/hour until 50 km/hour, and this road used 8 curves. For surface area hard compact thickness is 7,5 cm used asphalt concrete, sub base is 20 cm used split class A and base is 25 cm used sirtu class A. This road building was carried out within 46 day with a total fund Rp 21.963.276.000,00.
Item Type: | Thesis (Other) |
---|---|
Uncontrolled Keywords: | perhitungan angka pertumbuhan lalulintas, penentuan titik koordinat, jarak, Sudut Antara Dua Tangen (Δ), Alinyemen Horizontal, Alinyemen Vertikal dan Tebal Perkerasan. |
Subjects: | T Technology > TH Building construction |
Divisions: | Civil Engineering > Undergraduate Theses |
Depositing User: | Mrs Trisni Handayani |
Date Deposited: | 21 Aug 2015 02:11 |
Last Modified: | 21 Aug 2015 02:11 |
URI: | http://eprints.polsri.ac.id/id/eprint/115 |
Actions (login required)
![]() |
View Item |