PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN JALAN PALEMBAYAN - MATUR KABUPATEN AGAM PROVINSI SUMATERA BARAT STA 0+000 – STA 8+600

Anjaya Nuelta, Anggi and Arief, Syahrial (2014) PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN JALAN PALEMBAYAN - MATUR KABUPATEN AGAM PROVINSI SUMATERA BARAT STA 0+000 – STA 8+600. Other thesis, Politeknik Negeri Sriwijaya.

[img]
Preview
Text (Cover)
COVER.pdf

Download (245kB) | Preview
[img]
Preview
Text (BAB I PENDAHULUAN)
BAB I.pdf

Download (144kB) | Preview
[img]
Preview
Text (BAB II TINJAUAN PUSTAKA)
BAB II.pdf

Download (1MB) | Preview
[img] Text (BAB III PERHITUNGAN GEOMETRIK DAN PERKERASAN JALAN)
BAB III.pdf
Restricted to Repository staff only

Download (2MB)
[img] Text (BAB IV MANAJEMEN PROYEK)
BAB IV.pdf
Restricted to Repository staff only

Download (1MB)
[img]
Preview
Text (BAB V PENUTUP)
BAB V.pdf

Download (91kB) | Preview
[img]
Preview
Text (DAFTAR PUSTAKA)
Daftar Pustaka.pdf

Download (48kB) | Preview

Abstract

Road has a very important role in promoting economic growth both locally and nationally. In writing this final report, the authors wanted to know how good planning in planning geometric design, pavement thickness, and building appendages in Palembayan -Matur, so the path to be traversed can provide a sense of security, comfortable, and economical for road users. In the geometric design of highway planning, things area reference in planning in clued the calculation of horizontal alignment, vertical alignment, pavement establish what will be used, and complementary building planning. From the results of the calculations above, Palembayan - Matur is a road with a speed class II road plan 30 km/ h, and in this way using 105 pieces bend. Layer of the road surface using Laston with 5 cm thick layer, the base layer of crushed stone using a class A with a 20 cm thick layer, while a layer of gravel subbase using a class A with a 15 cm thick layer. Construction of roads is carried out with in 279 days with a total fund of Rp 33.938.405.000.

Item Type: Thesis (Other)
Uncontrolled Keywords: Construction of roads is carried out with in 279 days with a total fund of Rp 33.938.405.000.
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Civil Engineering > Undergraduate Theses
Depositing User: Mr Bambang Anthony
Date Deposited: 03 Dec 2015 05:21
Last Modified: 03 Dec 2015 05:21
URI: http://eprints.polsri.ac.id/id/eprint/1199

Actions (login required)

View Item View Item