PERENCANAAN JARINGAN IRIGASI AIR GOHONG DESA GUNUNG AYU KECAMATAN TANJUNG SAKTI KABUPATEN LAHAT SUMATERA SELATAN

Putra, M. Ridwan and Amelia, Dessy (2014) PERENCANAAN JARINGAN IRIGASI AIR GOHONG DESA GUNUNG AYU KECAMATAN TANJUNG SAKTI KABUPATEN LAHAT SUMATERA SELATAN. Other thesis, Politeknik Negeri Sriwijaya.

[img]
Preview
Text (Cover)
Cover.pdf

Download (183kB) | Preview
[img]
Preview
Text (BAB I PENDAHULUAN)
BAB I.pdf

Download (366kB) | Preview
[img]
Preview
Text (BAB II TINJAUAN PUSTAKA)
BAB II.pdf

Download (758kB) | Preview
[img] Text (BAB III PERENCANAAN)
BAB III.pdf
Restricted to Repository staff only

Download (939kB)
[img] Text (BAB IV RENCANA KERJA DAN SYARAT-SYARAT)
BAB IV.pdf
Restricted to Repository staff only

Download (2MB)
[img]
Preview
Text (BAB V PENUTUP)
BAB V.pdf

Download (8kB) | Preview
[img]
Preview
Text (DAFTAR PUSTAKA)
daftar pustaka.pdf

Download (3kB) | Preview

Abstract

DI. Air Gohong is an area with its livelihood principal population is farming and gardening. On the other hand actually income level of farmer in the work area is low, because their farm productivity level is still low. Therefore, the network of irrigation is planned so that the productivity of farmer in the area can be a maximum. In planning this Air Gohong irrigation, we plan 20 secondary canals, there are from Saluran Sekunder Air Gohong 1 (SSAG 1) through Saluran Sekunder Bangunan Bagi 3 (SSBB 3), with total length of Canal is 6,715 m. Water requirement of Air Gohong Irrigation wich wide 704.5 Ha is 1.46 l /s/ ha. In planning a secondary Canal of the Air Gohong irrigation, several methods are used, including methods of Algebra, Penman method and others. From the dimensions calculation of the canal, the canal with the maximum dimensions contained in the SSAG 1 with dimensions a = 704.5 ha; Q = 1.032 m3/sec; b = 1.3 m; h = 0.7 m; w = 0.4; L = 315 m, while the minimum contained in SSBB 3 with dimensions A = 18 ha; Q = 0.026 m3/sec; b = 0.4 m; h = 0.4 m; w = 0.4; L = 530 m. Costs for the Development of Air Gohong Irrigation is Rp. 20,607,428,186, -, the total time of this project are 220 days.

Item Type: Thesis (Other)
Uncontrolled Keywords: with dimensions A = 18 ha; Q = 0.026 m3/sec; b = 0.4 m; h = 0.4 m; w = 0.4; L = 530 m. Costs for the Development of Air Gohong Irrigation is Rp. 20,607,428,186, -, the total time of this project are 220 days.
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Civil Engineering > Undergraduate Theses
Depositing User: Mr Bambang Anthony
Date Deposited: 02 Oct 2015 03:30
Last Modified: 02 Oct 2015 03:30
URI: http://eprints.polsri.ac.id/id/eprint/1219

Actions (login required)

View Item View Item