PERMANA, ADI and MAS’UD, M. RATNO (2014) PERENCANAAN JALAN LINGKAR SELATAN KOTA LUBUKLINGGAU PROVINSI SUMATERA SELATAN STA 0+000 S/D 8+263. Other thesis, Politeknik Negeri Sriwijaya.
|
Text (Cover)
1. COVER.pdf Download (182kB) | Preview |
|
|
Text (BAB I PENDAHULUAN)
2. BAB I.pdf Download (22kB) | Preview |
|
|
Text (BAB II LANDASAN TEORI)
3. BAB II.pdf Download (487kB) | Preview |
|
![]() |
Text (BAB III PERHITUNGAN KONSTRUKSI)
4. BAB III.pdf Restricted to Repository staff only Download (3MB) |
|
![]() |
Text (BAB IV MANAJEMEN PROYEK)
5. BAB IV.pdf Restricted to Repository staff only Download (508kB) |
|
|
Text (BAB V PENUTUP)
6. BAB V.pdf Download (12kB) | Preview |
|
|
Text (DAFTAR PUSTAKA)
7. DAFTAR PUSTAKA.pdf Download (7kB) | Preview |
Abstract
Road has a very important role in promoting economic growth both locally and nationally. In writing this final report, the authors wanted to know how good planning in planning geometric design, pavement thickness, and building appendages in , Lubuk Linggau Southern Ring Road, so the path to be traversed can provide a sense of security, comfortable, and economical for road users. In the geometric design of highway planning, things are a reference in planning include the calculation of horizontal alignment, vertical alignment, pavement establish what will be used, and complementary building planning. From the results of the calculations above, Lubuk Linggau Southern Ring Road is a road class I road with a speed plan 70 km / h, and in this way using 12 bend. Layer of the road surface using Laston with 10 cm thick layer, the base layer of crushed stone using a class A CBR 100 with a 20 cm thick layer, while a layer of gravel subbase using a class B CBR 50 with a 35 cm thick layer . Construction of roads is carried out within 162 days with a total fund of Rp 53,517,761,000. Kata Kunci : Planning , Ringroad
Item Type: | Thesis (Other) |
---|---|
Uncontrolled Keywords: | Planning , Ringroad |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Civil Engineering > Undergraduate Theses |
Depositing User: | Mr Bambang Anthony |
Date Deposited: | 02 Dec 2015 03:24 |
Last Modified: | 02 Dec 2015 03:24 |
URI: | http://eprints.polsri.ac.id/id/eprint/1284 |
Actions (login required)
![]() |
View Item |