PERENCANAAN JEMBATAN RANGKA BAJA SEMANGUS KABUPATEN MUSI RAWAS PROVINSI SUMATERA SELATAN BENTANG 80 M

Adi Saputra, Angga and Dhea Sasmita, Aulia (2014) PERENCANAAN JEMBATAN RANGKA BAJA SEMANGUS KABUPATEN MUSI RAWAS PROVINSI SUMATERA SELATAN BENTANG 80 M. Other thesis, Politeknik Negeri Sriwijaya.

Full text not available from this repository.

Abstract

The final stage is basically to discuss the problem – the early stage of planning a bridge to get the best result meet the principal – the principal structural elements such as strength and overall stabillity, compibility, ease of construction, economical and aesthetic form. The reason of this title because the author took in planning involves a variety of disciplines including Mechanical Engineering, Construction Concrete and Steel Construction. Regulations Standards used in this plan is RSNI – T – 02 – 2005 ( standard Fees To Bridge ), RSNI – T – 03 – 2005 ( Planning Standards Foor Steel Structure Bridge ), RSNI – T – 12 – 2004 ( Planning Standard Concrete For Bridges ). Based on the result of planning that has been done, then to the main frame using WF 400 x 400 x 45 x 70. Frame of the wind using the profile L 200 x 200 x 16 dan Profile WF 300 x 300 x 12 x 12. As for the transverse girder used profile WF 700 x 300 x 16 x 28 and transverse girder used WF 700 x 300 x 16 x 28.

Item Type: Thesis (Other)
Uncontrolled Keywords: As for the transverse girder used profile WF 700 x 300 x 16 x 28 and transverse girder used WF 700 x 300 x 16 x 28.
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Civil Engineering > Undergraduate Theses
Depositing User: Mr Bambang Anthony
Date Deposited: 01 Dec 2015 01:45
Last Modified: 01 Dec 2015 01:45
URI: http://eprints.polsri.ac.id/id/eprint/1334

Actions (login required)

View Item View Item