PERENCANAAN PERKUATAN TEBING SUNGAI MUSI DESA BAILANGU BARAT KAB. MUSI BANYUASIN

Melinda, Agnesia Ayu and Jainta, Jumaika Repa (2015) PERENCANAAN PERKUATAN TEBING SUNGAI MUSI DESA BAILANGU BARAT KAB. MUSI BANYUASIN. Other thesis, Politeknik Negeri Sriwijaya.

[img]
Preview
Text (COVER)
COVER.pdf

Download (602kB) | Preview
[img]
Preview
Text (BAB I PENDAHULUAN)
BAB I PENDAHULUAN.pdf

Download (265kB) | Preview
[img]
Preview
Text (BAB II TINJAUAN PUSTAKA)
BAB II TINJAUAN PUSTAKA.pdf

Download (1MB) | Preview
[img] Text (BAB III PERHITUNGAN KONSTRUKSI)
BAB III PERHITUNGAN KONSTRUKSI.pdf
Restricted to Repository staff only

Download (1MB)
[img] Text (BAB IV MANAJEMEN PROYEK)
BAB IV MANAJEMEN PROYEK.pdf
Restricted to Repository staff only

Download (808kB)
[img]
Preview
Text (BAB V PENUTUP)
BAB V KESIMPULAN.pdf

Download (33kB) | Preview
[img]
Preview
Text (DAFTAR PUSTAKA)
DAFTAR PUSTAKA.pdf

Download (27kB) | Preview

Abstract

Sheet Pile used as a retaining wall construction. Construction is later expected to prevent scour the water in the river and can make the area surrounding the banks and can make area in musi river look cleanly and beautifully. Sheet Pile on this project will planned in the Desa Bailangu Barat Kab. Musi Banyuasin. Planning of the steel sheet pile using the calculation of steel sheet pile with free end method. In this planning also will plan about project management includes calculation of budget plan (RAB), Description Unit Price Analysis and compensation Network Planning (NWP) to determine the time and squence of work to do and to control the financial progess of the work and to use the curve S. Based on calculation, it can be concluded this steel sheet pile will pile 16 m inside the land and long 200m, the size of the pile cap long 200m, width 0,70 m, and thick 0,80 m. To carry out this project need the budge Rp. 32.100.200.000.

Item Type: Thesis (Other)
Uncontrolled Keywords: work to do and to control the financial progess of the work and to use the curve S. Based on calculation, it can be concluded this steel sheet pile will pile 16 m inside the land and long 200m, the size of the pile cap long 200m, width 0,70 m, and thick 0,80 m. To carry out this project need the budge Rp. 32.100.200.000.
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Chemical Engineering > Undergraduate Theses
Depositing User: Mrs Trisni Handayani
Date Deposited: 18 Nov 2015 08:45
Last Modified: 18 Nov 2015 08:45
URI: http://eprints.polsri.ac.id/id/eprint/1722

Actions (login required)

View Item View Item