PERENCANAAN GEDUNG TERPADU PALANG MERAH INDONESIA DI PALEMBANG PROVINSI SUMATERA SELATAN

PURNOMO, HENDRO and KURNIA, ULFA NANA (2015) PERENCANAAN GEDUNG TERPADU PALANG MERAH INDONESIA DI PALEMBANG PROVINSI SUMATERA SELATAN. Other thesis, Politeknik Negeri Sriwijaya.

[img]
Preview
Text (COVER)
COVER.pdf

Download (897kB) | Preview
[img]
Preview
Text (BAB I PENDAHULUAN)
BAB I.pdf

Download (158kB) | Preview
[img]
Preview
Text (BAB II TINJAUAN PUSTAKA)
BAB II.pdf

Download (2MB) | Preview
[img] Text (BAB III PERHITUNGAN KONSTRUKSI)
BAB III.pdf
Restricted to Repository staff only

Download (4MB)
[img]
Preview
Text (BAB IV PENGELOLAAN PROYEK)
BAB IV.pdf

Download (221kB) | Preview
[img]
Preview
Text (BAB V PENUTUP)
BAB V.pdf

Download (77kB) | Preview
[img]
Preview
Text (DAFTAR PUSTAKA)
DAFTAR PUSTAKA.pdf

Download (6kB) | Preview

Abstract

Population growth makes it increasingly dense population in the city of Palembang. And in establishing a sense of humanity and mutual help among fellow social beings, necessary for building social humanity to help if there is something of a disaster or other matters between the increasingly dense population. Thus it is planned construction of Building Integrated Palang Merah Indonesia is to make it happen. In the wole builing is part of the building using reinforced concrete structures and using footprint foundation as the structure of the bottom of the building. The building is based on SNI 2847-2013 as a theoretical basis, and the rate of imposition Indonesia to hall 1983. we also use several other books such as Reinforced Concrete Structures Istimawan Dipohusodo essay, and written by Gideon Basic of Planning Reinforced Concrete. From the results of the planning for Integrated Building Indonesian Red Cross which consist of 3 floors, is used dimension of the column 35 x 35 cm2 with diameter reinforcement 16 mm, dimension beams 20 x 35 cm2, 30 x 50 cm2, 30 x 40 cm2 with diameter reinforcement 13 mm, thickness of plates 10 cm in diameter reinforcement of 8 mm, and the depth of foundation 1,65 meters. Based onthe calculations can be concluded that this structure is stable and safe. And for the implementatiton of this development spend Rp 2,307,112,672.13,- Kata Kunci : Structure, Dimension, Concrete, Reinforcement, Management

Item Type: Thesis (Other)
Uncontrolled Keywords: Structure, Dimension, Concrete, Reinforcement, Management.
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Civil Engineering > Undergraduate Theses
Depositing User: Mrs Trisni Handayani
Date Deposited: 18 Nov 2015 08:26
Last Modified: 18 Nov 2015 08:26
URI: http://eprints.polsri.ac.id/id/eprint/1841

Actions (login required)

View Item View Item