PERENCANAAN JARINGAN IRIGASI AIR GILAS KABUPATEN OKU TIMUR PROVINSI SUMATERA SELATAN

FEBRIYANTO, FIRDANA and NUGRAHA, MUHAMMAD HADID (2015) PERENCANAAN JARINGAN IRIGASI AIR GILAS KABUPATEN OKU TIMUR PROVINSI SUMATERA SELATAN. Other thesis, Politeknik Negeri Sriwijaya.

[img]
Preview
Text (COVER)
Cover.pdf

Download (229kB) | Preview
[img]
Preview
Text (BAB I PENDAHULUAN)
BAB I Air Gilas (Complete).pdf

Download (245kB) | Preview
[img]
Preview
Text (BAB II TINJAUAN PUSTAKA)
BAB II Air Gilas (complete).pdf

Download (903kB) | Preview
[img] Text (BAB III PERENCANAAN JARINGAN IRIGASI)
BAB III Air Gilas (complete).pdf
Restricted to Repository staff only

Download (633kB)
[img] Text (BAB IV MANAJEMEN PROYEK)
BAB IV Air Gilas (complete).pdf
Restricted to Repository staff only

Download (686kB)
[img]
Preview
Text (BAB V PENUTUP)
BAB V Air Gilas (complete).pdf

Download (57kB) | Preview
[img]
Preview
Text (DAFTAR PUSTAKA)
Daftar pustaka .pdf

Download (21kB) | Preview

Abstract

The final report is about the planning of irrigation network at Air Gilas area East Oku regency. This report discusses the planning and calculation of the dimensions of the primary line SPG with a total channel length of 410 m and secondary line SSG1KI until SSG4AKI with a total channel length of 2628 m. The planning of the irrigation network is planned to meet or support the food production and food production is increasing. Planning data for the writing of this final report includes rainfall data, map, and others. The method used is the method of rata-rata Aljabar and methods Penmann and others. Based on calculations derived dimensions of each trapezoid-shaped primary channel for SPG ( b : h = 1 : 2, v = 0,50 m/det , I = 0,00050612 L = 410 m ), SSG1KI ( b : h = 1 : 2, v = 0,50 m/det , I = 0,00046949 L = 567 m ), SSG2AKI ( b : h = 1 : 2, v = 0,40 m/det , I = 0,00030256 L = 826 m ), SSG2KI ( b : h = 1 : 2, v = 0,50 m/det , I = 0,00057405 L = 329 m ), SSG3KI ( b : h = 1 : 2, v = 0,50 m/det , I = 0,00049247 L = 395 m ), SSG4AKI ( b : h = 1 : 2, v = 0,45 m/det , I = 0,00036447 L = 808 m). In implementing this project requires funding budget of Rp13.933.480.000,00. Key words: Irrigation, Air Gilas,Aljabar method.

Item Type: Thesis (Other)
Uncontrolled Keywords: Irrigation, Air Gilas,Aljabar method.
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Civil Engineering > Undergraduate Theses
Depositing User: Mrs Trisni Handayani
Date Deposited: 18 Nov 2015 08:25
Last Modified: 18 Nov 2015 08:25
URI: http://eprints.polsri.ac.id/id/eprint/1842

Actions (login required)

View Item View Item