Putri, Mutiara (2015) PROTOTYPE STEAM POWER PLANT (Analisis Kehancuran Exergi dan Fouling Factor pada Kondensor). Other thesis, Politeknik Negeri Sriwijaya.
|
Text (COVER)
01. COVER.pdf Download (191kB) | Preview |
|
|
Text (BAB I PENDAHULUAN)
02. BAB 1.pdf Download (12kB) | Preview |
|
|
Text (BAB II TINJAUAN PUSTAKA)
03. BAB 2.pdf Download (591kB) | Preview |
|
![]() |
Text (BAB III METODELOGI PENELITIAN)
04. BAB 3.pdf Restricted to Repository staff only Download (62kB) |
|
![]() |
Text (BAB IV HASIL DAN PEMBAHASAN)
05. BAB 4.pdf Restricted to Repository staff only Download (220kB) |
|
|
Text (BAB V KESIMPULAN DAN SARAN)
06. BAB 5.pdf Download (7kB) | Preview |
Abstract
The purposes of getting a unit of power plant as the prototype of steam boiler proof of the theory of electricity generator seem like in the energy industry. Circulating of cooling water system from the ouput of steam turbine would be condensation on condenser so as well. Based on the influence of the variation from the flowrate of cooling water such as 15 L/min, 12 L/min, and 9 L/min to get the right value of exergy destruction and fouling factor on the condenser. The results from calculating actual data were show the good condition of fouling factor of condenser is 0.001. A good condition of the cooling water flowrates is 12 L/min within volumes of steam and volumes of condensate is 20 L condenser operates. Keyword: prototype, boiler, condenser, exergy
Item Type: | Thesis (Other) |
---|---|
Uncontrolled Keywords: | prototype, boiler, condenser, exergy |
Subjects: | T Technology > TP Chemical technology |
Divisions: | Chemical Engineering > Undergraduate Theses |
Depositing User: | Mrs Trisni Handayani |
Date Deposited: | 07 Jan 2016 02:14 |
Last Modified: | 07 Jan 2016 02:14 |
URI: | http://eprints.polsri.ac.id/id/eprint/1984 |
Actions (login required)
![]() |
View Item |