PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN KAKU PADA RUAS JALAN SEI. LILIN – PENINGGALAN PROVINSI SUMATERA SELATAN STA 7+000 – STA 12+000

HANIF, IZZI and PURWANTO, M. IMAM (2016) PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN KAKU PADA RUAS JALAN SEI. LILIN – PENINGGALAN PROVINSI SUMATERA SELATAN STA 7+000 – STA 12+000. Other thesis, POLITEKNIK NEGERI SRIWIJAYA.

[img]
Preview
Text
Cover.pdf

Download (684kB) | Preview
[img]
Preview
Text (BAB I Pendahuluan)
BAB I.pdf

Download (311kB) | Preview
[img]
Preview
Text (BAB II Tinjauan Pustaka)
BAB II.pdf

Download (2MB) | Preview
[img] Text (BAB III Perhitungan Konstruksi)
BAB III.pdf
Restricted to Repository staff only

Download (2MB)
[img] Text (BAB IV Manajemen Proyek)
BAB IV.pdf
Restricted to Repository staff only

Download (2MB)
[img]
Preview
Text (BAB V Penutup)
BAB V.pdf

Download (111kB) | Preview
[img]
Preview
Text
Daftar Pustaka.pdf

Download (100kB) | Preview
[img] Other (Lampiran)
Kurva S.xls

Download (117kB)

Abstract

This final project is planning a geometric design and rigid pavement on roads Sei. Lilin–Peninggalan, South Sumatra in sta. 7 + 000 to sta. 12 + 000. The road construction is a very important requirement as the main supporter of economic activity in both the central and regional levels. One of them is the area Sei. Lilin – Peninggalan, because these two areas is a potential region as a line of business and industry as well as the road is a causeway linking South Sumatra and Jambi Province. In planning the road Sei. Lilin - Peningalan authors plan total road length 5 km, width of pavement 7 m and 2 m shoulders on both sides of the road. The planning pavement using rigid pavement with a plate thickness of 20 cm and uses the quality of concrete K-350, as well as using aggregate subbase layer of class B with a thickness of 15 cm. Calculations obtained from ADT 29198.33 smp, so the street is classified in class I (artery) who holds the value of smp>smp 20,000 based regulation Geometric Planning Highway. This road is planned with eight kinds of road bend, there is 2 Full Circle (FC), 2 Spiral - Spiral (SS), 4 Spiral Circle Spiral (SCS). Based on calculations obtained costs incurred on road planning Sei. Lilin - Peninggalan is Rp. 38.919.775.000,00 (Thirty Eight Billion Nine Hundred Nineteen Million Seven Hundred Seventy Five Thousand Rupiah). The construction of this road implemented within 132 calendar days.

Item Type: Thesis (Other)
Uncontrolled Keywords: Jalan, Desain Geometrik, Tebal perkerasan kaku
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Civil Engineering > Undergraduate Theses
Depositing User: Mrs Trisni Handayani
Date Deposited: 29 Mar 2017 07:58
Last Modified: 29 Mar 2017 07:58
URI: http://eprints.polsri.ac.id/id/eprint/3366

Actions (login required)

View Item View Item