PERENCANAAN JARINGAN PIPA DISTRIBUSI AIR BERSIH KELURAHAN BUKIT SANGKAL KECAMATAN KALIDONI PALEMBANG

SEPTYANTI, ANISYAH and MUHAMMAD, JABAR (2016) PERENCANAAN JARINGAN PIPA DISTRIBUSI AIR BERSIH KELURAHAN BUKIT SANGKAL KECAMATAN KALIDONI PALEMBANG. Other thesis, POLITEKNIK NEGERI SRIWIJAYA.

[img]
Preview
Text
1. Cover.pdf

Download (295kB) | Preview
[img]
Preview
Text (BAB I Pendahuluan)
2. Bab I.pdf

Download (109kB) | Preview
[img]
Preview
Text (BAB II Tinjauan Pustaka)
3. Bab II.pdf

Download (372kB) | Preview
[img] Text (BAB III Perhitungan Konstruksi)
4. Bab III.pdf
Restricted to Repository staff only

Download (1MB)
[img] Text (BAB IV Manajemen Konstruksi)
5. Bab IV.pdf
Restricted to Repository staff only

Download (792kB)
[img]
Preview
Text
6. Bab V.pdf

Download (80kB) | Preview
[img]
Preview
Text
7. Daftar Pustaka.pdf

Download (76kB) | Preview
[img]
Preview
Text
8. Lampiran.pdf

Download (16MB) | Preview

Abstract

Kelurahan Bukit Sangkal has ±392 Ha area, with population growth and infrastructure is increasing every years. Because this increase, the clean water needed will also continue to increase. The purpose from the writer is wanted to know how much discharge water must flowed in that region, so that the clean water needs can be met equally. Clean water distribution pipelines are designed using calculation Manning-Gauckler-Strickler. To calculate the population projections next 20 years, used Requesi Exponential Method. From the results of these calculations obtained the required amount of water at Kelurahan Bukit Sangkal, then performed calculations on each element discharge pipelines by using Hardy Cross. From these calculations obtained Q the plan age total namely 141,2509 liters/second to 2015-2035. In the designing of clean water distribution pipeline, the type of pipe is planned that type of PVC pipe with a diameter of 110 mm, 160 mm, 200 mm and 315 mm. Other than that, for water distribution throughout the region met to plan the required reservoir volume of 3030.678 m³ with budget-estimate plan as big as Rp. 2,130,000,000.00 with 127 day work time.

Item Type: Thesis (Other)
Uncontrolled Keywords: Air Bersih, Debit Air, Requesi Eksponensial, Hardy Cross
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Civil Engineering > Undergraduate Theses
Depositing User: Mrs Trisni Handayani
Date Deposited: 12 Apr 2017 02:30
Last Modified: 12 Apr 2017 02:30
URI: http://eprints.polsri.ac.id/id/eprint/3388

Actions (login required)

View Item View Item