PRASETYO, DONNY (2016) ANALISA KOORDINASI OVER CURRENT RELAY (OCR) DAN GROUND FAULT RELAY (GFR) PADA FEEDER A05 DI MAIN SWITCH STATION PT BUKIT ASAM (PERSERO) TBK. Other thesis, POLITEKNIK NEGERI SRIWIJAYA.
|
Text
1. Cover, Halaman Pengesahaan dll .pdf Download (422kB) | Preview |
|
|
Text
2. BAB I.pdf Download (236kB) | Preview |
|
|
Text
3. Bab II.pdf Download (511kB) | Preview |
|
![]() |
Text (BAB III Metode Penelitian)
4. BAB III.pdf Restricted to Repository staff only Download (259kB) |
|
![]() |
Text (BAB IV Pembahasan)
5. Bab IV.pdf Restricted to Repository staff only Download (531kB) |
|
|
Text
6. BAB V.pdf Download (119kB) | Preview |
|
|
Text
7. DAFTAR PUSTAKA.pdf Download (178kB) | Preview |
Abstract
One of the most important electrical equiments the protector, where over current relay and ground fault relay which used in Main Switch Station. The Over Current Relay adn Ground Fault Relay is used as a protector if the current in trouble. The main of this last assigmnent are transformer, the line, dan kind of the conductor. This last assigment was created with reaserch at PT. Bukit Asam (Persero). From the reaserch, get the setting value of over current relay 15 A and value of Ground Fault Relay 0.57 A. The setting time over current relay 0.157 and setting time ground fault relay 0.971 s.
Item Type: | Thesis (Other) |
---|---|
Uncontrolled Keywords: | Relay arus lebih, relay gangguan tanah |
Subjects: | T Technology > TK Electrical engineering. Electronics Nuclear engineering |
Divisions: | Electrical Engineering > Undergraduate Theses |
Depositing User: | Mrs Trisni Handayani |
Date Deposited: | 31 Jul 2017 04:08 |
Last Modified: | 31 Jul 2017 04:08 |
URI: | http://eprints.polsri.ac.id/id/eprint/3808 |
Actions (login required)
![]() |
View Item |