PERENCANAAN SISTIM KENDALI POMPA AIR MENGGUNAKAN KONTAKTOR PADA SISI PRIMER DI PDAM TIRTA MUSI PALEMBANG

PERMATA SARI, DINA (2014) PERENCANAAN SISTIM KENDALI POMPA AIR MENGGUNAKAN KONTAKTOR PADA SISI PRIMER DI PDAM TIRTA MUSI PALEMBANG. Other thesis, Politeknik Negeri Sriwijaya.

[img]
Preview
Text (Cover)
COVER.pdf

Download (310kB)
[img]
Preview
Text (BAB I PENDAHULUAN)
BAB I.pdf

Download (27kB) | Preview
[img]
Preview
Text (BAB II TINJAUAN PUSTAKA)
BAB II.pdf

Download (1MB) | Preview
[img] Text (BAB III PERENCANAAN)
BAB III.pdf
Restricted to Repository staff only

Download (493kB)
[img] Text (BAB IV PEMBAHASAN)
BAB IV.pdf
Restricted to Repository staff only

Download (591kB)
[img]
Preview
Text (BAB V KESIMPULAN DAN SARAN)
BAB V.pdf

Download (12kB) | Preview
[img]
Preview
Text (DAFTAR PUSTAKA)
DAFTAR PUSTAKA.pdf

Download (13kB) | Preview

Abstract

The primary side making process raw water from the river Musi and the secondary side of the water purification process until the water distribution process. Initial process begins with water extractionis done in the Musi river intakes and new reef tank water is pumped to the first in IPA Rambutan to undergo some further processing until it becomes clean water ready to be distributed. The process of taking water in takes using the reef last five pumps and five motors. Planning water treatment control system in automatic taps can be planned using the contactor. For circuit operation pump work automatically, controlled by a switch S22.A2, when the switch S22.A1 then automatically positioned on the coil of K23T, K32T, K40, K48T, K56T will receivean electric current, after the child contact T17, T18, T19, T20, T21 becomes NC, the pump motor will start to work, when the operating time ofthe pump motor has reached 7x24 hours then the motor will stop working to operate T1 this was done because the timer is used to time delay using contactors in the control system makes it easy to pump taps water to operate and make a series of control over the way evisiensi than using manual labor. Keywords: Primary side, Pumps, Motors, Contactors

Item Type: Thesis (Other)
Uncontrolled Keywords: Primary side, Pumps, Motors, Contactors
Subjects: T Technology > TJ Mechanical engineering and machinery
Divisions: Telecommunication Engineering > Undergraduate Theses
Depositing User: Mr Bambang Anthony
Date Deposited: 22 Jan 2016 03:44
Last Modified: 22 Jan 2016 03:44
URI: http://eprints.polsri.ac.id/id/eprint/388

Actions (login required)

View Item View Item